1 / 8

L-3c Presentation

L-3c Presentation. Team# 5 Abdullah AbuKhwejah leader Abdullah Siami recorder Adam Jalal responder Rami Almatani keep time Mohamed AlShayea facilitator. Agenda. Context 1 min The work 1 min KTDA – Adverse Cons. 1 min Cost Estimate 1 min

rae-mccarty
Télécharger la présentation

L-3c Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. L-3c Presentation Team# 5 • Abdullah AbuKhwejah leader • Abdullah Siami recorder • Adam Jalal responder • Rami Almatani keep time • Mohamed AlShayea facilitator

  2. Agenda • Context 1 min • The work 1 min • KTDA – Adverse Cons. 1 min • Cost Estimate 1 min • The project artifact 1 min • Discussion 1 min

  3. Context: • In this assignment we continued to use the information we got from the previous two assignments and we applied the information to a K.T.D.A table. First we applied the musts to the available artifacts to see which artifacts we could continue with. Secondly we applied the wants to the left artifacts which were three. Finally we write down the possible estimates of the artifact we are going to work on , and how long it might take us.

  4. KT DA sample

  5. Adverse Consequence sample Alternative- Bicycle   probability of occurrence     Seriousness     PXS Project failure       8      10      80 Overtime work      7      7     49 Requires maintenance      6      3      18 Difficult to apply Dissection   5      8      40 Hard to get information 3 7 21 Total = 208

  6. Cost Estimate Sample • we study the cost estimate for the Bicycle • Time: 6 hours • 6 hours X 5 members = 35 hr • Materials: Bicycle: 150 SR Dynamo: 50 SR Wires: 30 SR • Tools: Screw driver: 10 SR

  7. Our project artifact: • We chose the bicycle to be applied in our project, because it is simple to dissect and reassemble and has Mechanical parts and we can add electrical parts. The idea of project is to explain how we can transfer the motional energy into electrical energy. First the dynamo charges the battery and battery gives the lamp energy to help to light work. the battery helps lamp to stay work if the bicycle stopped or the energy was not enough.

  8. Discussion: • At the end of this assignment which L3-c, we got one important result which is one artifact. In this assignment we applied the techniques that we applied in the concept weeks to get one artifact from ten that we got at the end of the last assignment. These techniques are K.T. Decision Analysis and Adverse Consequences. So, we got benefits from this assignment. We are also ready for the next step.

More Related