1 / 8

C. Noshi/RASC, Kyoto Univ.

MDP (Mission Data Processor) for BepiColombo MMO Y. Kasaba, T. Takashima, H. Hayakawa (MDP Core Team = JAXA/BepiColombo Project Office). Supported by ISAS Data Handling Group. [MDP team] Core Members PSU NTS & H. Hayakawa (JAXA) IPD NTS & Y. Kasaba (JAXA)

ralph
Télécharger la présentation

C. Noshi/RASC, Kyoto Univ.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MDP (Mission Data Processor) for BepiColombo MMO Y. Kasaba, T. Takashima, H. Hayakawa (MDP Core Team = JAXA/BepiColombo Project Office) Supported by ISAS Data Handling Group [MDP team] Core Members PSU NTS & H. Hayakawa (JAXA) IPD NTS & Y. Kasaba (JAXA) DPU MHI & Y. Kasaba & T. Takashima (JAXA) MPPE (for MDP-1) incl. support to MGF-O T. Takashima, K. Asamura (JAXA) PWI (for MDP-2) incl. support to MGF-I/MSASI/MDM Y. Kasahara, T. Imachi (Kanazawa U) H. Kojima, Y. Ueda (RISH/Kyoto U) Y. Kasaba (JAXA) MMO Mercury Magnetospheric Orbiter C. Noshi/RASC, Kyoto Univ.

  2. Progress from Jan. 2006 [Meetings incl. Payload members] * Large meetings: before the next MMO-Design Meeting & MMO-SWG in May-June. (with the update of “I-ICD FAQ” and “MMO-Payload Action Item List”) [Electrical] * PSU might be independently prepared for the instruments outside of MDP. * Grounding Concept in MDP-2 : It will be fixed based on the EM test by PWI. [Mechanical / Thermal] * Vertical style: It will be studied in detail in 2006FY. [DPU] * SpaceWire I/F : Hardware design is progressed. Test hardware (= E-GSE in future) is in development. * Software : Conceptual design is progressed. [Development Schedule] *Schedule for MDP & Its I/F is updated.

  3. Electrical concept (Old: Jan 2006) Command Command Telemetry Telemetry Power Power Common instruments PI instruments MEA1 (sensor/elec.) Spacecraft System Mission Data Processor [MDP-1] MEA2 (sensor/elec.) MIA (sensor/elec.) DPU: 9 clients [CPU+MEM] MSA (sensor/elec.) HEP-ele (sensor/elec.) IPD [Switcher/ Limiter] HEP-i (sensor/elec.) PSU [DC/DC Converter] ENA (sensor/elec.) MGF-out (sensor) MGF-out MDM (sensor) MDM (elec) MSASI (sensor/elec.) 1 Hz sync Mission Data Processor [MDP-2] MGF-in (sensor) MGF-in PWI EWO-E/B (+AM2P) MEFISTO-E SORBET SC (elec/sensor) DPU: 10 clients [CPU+MEM] MEFISTO (pre/sensor) WPT (pre/sensor) (motor/HK) IPD [Switcher/ Limiter] PSU [DC/DC Converter] MAST/WPT-E MAST-AC/DC

  4. Electrical concept: New (Mar 2006) Command Command Telemetry Telemetry Power Power Common instruments PI instruments MEA1 (sensor/elec.) Spacecraft System Mission Data Processor [MDP-1] MEA2 (sensor/elec.) MIA (sensor/elec.) DPU: 9 clients [CPU+MEM] MSA (sensor/elec.) HEP-ele (sensor/elec.) IPD [Switcher/ Limiter] HEP-i (sensor/elec.) PSU [DC/DC Converter] ENA (sensor/elec.) MGF-out (sensor) MGF-out MDM (sensor) MDM (elec) MSASI (sensor/elec.) 1 Hz sync Mission Data Processor [MDP-2] MGF-in (sensor) MGF-in PWI EWO-E/B (+AM2P) MEFISTO-E SORBET SC (elec/sensor) DPU: 10 clients [CPU+MEM] MEFISTO (pre/sensor) WPT (pre/sensor) (motor/HK) IPD [Switcher/ Limiter] PSU [DC/DC Converter] MAST/WPT-E MAST-AC/DC

  5. MDP Chassis plan (Mar.2006) Mechanical / Thermal

  6. MDP Chassis plan (Mar.2006) Mechanical / Thermal MDP-2 IPD-1 IPD-2 All: <=A5-size DPU-CPU DPU-I/F MDP-1PSU MGF-O-E Digital / Power part should be separated & insulated. 162.5mm(TBD) 25mm(TBD) 179mm(TBD)

  7. MDP Chassis plan (Mar.2006) Order is free. It will be defined by MHI based on the simplification. Mechanical / Thermal MDP-2 MGF-I-E DPU-I/F MAST/WPT-E AM2P DPU-CPU All: <=A5-size EWO-B-field EWO-E-field IPD-2 SORBET IPD-1 MEFISTO MDP-2PSU Digital / Power part: separated & insulated from PWI/MGF 162.5mm(TBD) 50mm(TBD) 30mm(TBD) 25mm(TBD) 334mm(TBD)

  8. MDP Chassis plan (Mar.2006) Mechanical / Thermal *Action Items in 2006FY 1) Establishment of “MDP-Chassis concept” = “Vertical style” Development & Test of “MDP MTM” & “MDP-STM” in Apr-Sep 2006. (No support from each payload team is requested at the moment.) 2) Establishment of “PCB” inside MDP-1 & MDP-2. Following matters will be updated & discussed after the MDP-STM test. - Frame concept - Heat Path concept - Harness & Connector concept

More Related