An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RR-TAG (802.18) to 802.11 Liaison Report Date: 2013-03-22 Authors: Rich Kennedy, BlackBerry

  2. Abstract This presentation is the liaison report from the RR-TAG for the March 2013 IEEE 802.11 Plenary in Orlando. Rich Kennedy, BlackBerry

  3. FCC Documents Reviewed and Approved by the RR-TAG • There were no documents approved for submission to the FCC at this meeting. • The RR-TAG expects to finalize and approve comments to the FCC 5 GHz U-NII Band Rules Revision NRPM at a teleconference meeting to be held on on Friday April 19th, at 1:00 PM ET. • Link to NPRM: 18-13/016r0 John Notor, Notor Research

  4. ITU-R Documents from 802.16 and 802.11 REG SC Reviewed and Approved by the RR-TAG • The RR-TAG approved the following documents from 802.16 for EC review and submission to ITU-R WP 5D: • 18-13/034r1, Proposed LS to ITU-R WP 5D: Update toward Rec. ITU-R M.1457-12 (Meeting X Notification) Link: 18-13/034r1 • 18-13/035r1, Proposed Cont. to ITU-R WP 5D- Update of WirelessMAN-Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+2) Link: 18-13/035r2 • The RR-TAG approved the following document from the 802.11 Regulatory Standing Committee for EC review and submission as an IEEE 802 document to ITU-R WP 5A: • 18-13/038r3, IEEE 802 Input to WP5A on 5 GHz Link: 18-13/038r3 John Notor, Notor Research

  5. Other Documents Reviewed and Approved by the RR-TAG • The RR-TAG approved the following document from 802.16 for EC review and submission to IETF, copy to the FCC: • 18-13/036r0, Proposed Statement to IETF LMAP on IEEE P802.16.3 Activity Link: 18-13/036r0 • The RR-TAG approved the following document from 802.16 for EC review and submission to the Broadband Forum, copy to the FCC: • 18-13/037r1 Proposed statement to BBF: Response to liaison of 8 March on Performance Measurements Architecture Link: 18-13/037r1 John Notor, Notor Research

  6. EU RSPG Consultation on the 5 GHz Band • Information arrived too late for discussion and approval by 802.11 WG this week • Request the 802.11WG chair authorize the 802.11 Regulatory SC to develop a response, based on document 11-13/353r2, the framework document approved this week in the FCC proceeding, to be reviewed and approved by the RR-TAG on a teleconference to be held on April 11th, to be forwarded to the EC for approval and submittal to the regulatory authority Rich Kennedy, BlackBerry