OSLC PLM Workgroup Working notes

OSLC PLM Workgroup Working notes. 18 th Jan 2011. Attendees. Rainer Ersch Mike Loeffler Pascal Vera Gray Bachelor (Chair) Sky Matthews Annap Derebail Samit Mehta Keith Collyer Steve Speicher Scott Bosworth A welcome to Nick Crossley. Agenda. Please refer to the wiki.

rangle
Télécharger la présentation

OSLC PLM Workgroup Working notes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OSLC PLM WorkgroupWorking notes 18th Jan 2011 OSLC PLM Workgroup Jan18th 2011

  2. Attendees • Rainer Ersch • Mike Loeffler • Pascal Vera • Gray Bachelor (Chair) • Sky Matthews • Annap Derebail • Samit Mehta • Keith Collyer • Steve Speicher • Scott Bosworth • A welcome to Nick Crossley OSLC PLM Workgroup Jan18th 2011

  3. Agenda • Please refer to the wiki OSLC PLM Workgroup Jan18th 2011

  4. Effectivity parms OSLC PLM Workgroup Jan18th 2011

  5. Notes about the analysis of the PLM Context from STEP • Viewpoints have • Effectivity • Specification • Option value • Used to form rules • These configure the P_V_D • Product_configuration of the effectivity & variant options, versions • Precise or set • Product_specification is a sub-level of configuration • E.g. a test config OSLC PLM Workgroup Jan18th 2011

  6. Assumption • At the start of the Scenario the CR has a PLM context assigned • The scenario results in an update of the PLM context (arising from the changes made to meet the new/changed Requirement) • Reassignment of PLM Context from other CRs is out of scope initially OSLC PLM Workgroup Jan18th 2011

  7. Remarks about the PLM context in ALM • In the our scenario the CR needs to make available • Product class, spec, the configuration and its intent • What is the context in ALM for our Requirement ? • Project • Baselines • Simple approach is the link the Requirement to the PLM Context provided by the CR • This supports the basic approach within the scenario • Is it sufficient to link the prevailing ALM context to the PLM Context provided by the CR ? • Can think of this as the CR providing the context • Not if need to manage variants within ALM OSLC PLM Workgroup Jan18th 2011

  8. Update of action plan • Recap of the RM Context analysis by Gray/Ian • Setup the example in TCE by Mike • Setup the example in RTC T OSLC PLM Workgroup Jan18th 2011

  9. Update of action plan • Recap of the RM Context analysis by Gray/Ian • Setup the example in TCE by Mike • Setup the example in RTC TBD OSLC PLM Workgroup Jan18th 2011