150 likes | 296 Vues
This document outlines the comprehensive steps involved in the manipulation of a microconical fixture within the RPCM system. Key actions include grasping and actuating various components such as the ECU, Tether Loop, and Quarter Turn Rings. Each task is critical to ensure proper assembly and functionality, guiding through the release of keyway slot bolts, latches, and the activation of the pitch lock knob. The sequence of operations is vital for efficient assembly line processes, ensuring precision and reliability in the handling of the fixture in question.
E N D
Task Story Board • A Corde Lane & Brian Roberts Production
Task Steps • RPCM • Grasp and actuate Microconical Fixture (MEE) • ECU • Release Keyway Slot Bolts (BBD) • Grasp Tether Loop (TLG) • Release Connector Bolt (RAD) • APFR • Grasp and rotate Latch Quarter Turn Rings (AQP) • Release Latch Bolts (BBD) • Unlock Pitch Lock Knob (AQP) • Rotate Lower Body Probe (BBD) • Lock Pitch Lock Knob (AQP) • Grasp Yoke (TLG) • Squeeze Detent Levers (APG)