1 / 25

Campus developments: helping you avoid the snakes and jump up the ladders Speakers:

Campus developments: helping you avoid the snakes and jump up the ladders Speakers: Tim Allsop, Partner Beverley Firth, Partner Stuart Pemble, Partner. Introduction. Assumptions: You occupy an existing campus with adjacent vacant land

Télécharger la présentation

Campus developments: helping you avoid the snakes and jump up the ladders Speakers:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Campus developments: helping you avoid the snakes and jump up the ladders Speakers: Tim Allsop, Partner Beverley Firth, Partner Stuart Pemble, Partner

  2. Introduction Assumptions: • You occupy an existing campus with adjacent vacant land • Your estates strategy requires substantial new development on the adjacent land • The development is going to be as sustainable as possible

  3. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE Let’s play!

  4. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE You roll a 2!

  5. Your site is allocated in the LDF • Lesson: be aware of emerging policy documents and get involved

  6. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE You roll a 3!

  7. Problem: site is subject to a restrictive covenant Solution: investigation shows covenant likely to be unenforceable. Title insurance is obtained Lesson: carry out a title investigation/risk analysis before you start

  8. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE You roll a 3 again!

  9. Drafting for sustainability • Prepare early • You may need increased planning time • Initial construction costs may be higher but you should save money in the long term

  10. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE You roll a 4

  11. Guaranteed maximum price

  12. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE You roll a 6

  13. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE You get to roll again and get a 2!

  14. You make your planning application Problem: application was invalid Solution: make changes to ensure it complies Lesson: employ an experienced town planner

  15. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE You roll a 3

  16. Opportunity: you decide to bring a developer with specialist expertise on board and your scheme is restructured • Lesson: property development is not your core business. Make sure you have the right team working with you

  17. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE You roll a 2

  18. Planning permission granted JR challenge • Problem: a third party is threatening to challenge your permission • Solution: work with the LPA to present the arguments clearly to deflect the challenge • Lesson: be alive to the risk of challenge and manage that risk even before an application is made. Work with the LPA

  19. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE You roll a 1

  20. Control the University team

  21. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE

  22. Nearly there but… • Opportunity: your scheme is more expensive than expected but you obtain external funding • Lesson: make the most of all of the available opportunities

  23. 29 31 32 33 35 30 34 FINISH 25 23 28 27 26 24 22 15 19 20 16 17 18 21 14 13 12 11 10 9 8 6 7 1 2 3 4 5 STARTHERE You roll a 3

  24. Summary • Preparation, preparation, preparation • Get the right team of advisers/consultants/partners on board at the start • If all else fails: carry a big stick, stay out of the long grass and take the lift!