STAR Status Report for RHIC Coordination meeting Bill Christie January 12, 2005.

STAR Status Report for RHIC Coordination meeting Bill Christie January 12, 2005. Outline: Tuning min-bias Trigger components Calibrating Sub systems (e.g. Calorimeters) Getting started on Physics program Short in TPC. ZDC ADC Distributions from Collisions Friday 1/7/05.

rashby
Télécharger la présentation

STAR Status Report for RHIC Coordination meeting Bill Christie January 12, 2005.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STAR Status Report for RHIC Coordination meeting Bill Christie January 12, 2005. • Outline: • Tuning min-bias Trigger components • Calibrating Sub systems (e.g. Calorimeters) • Getting started on Physics program • Short in TPC

  2. ZDC ADC Distributions from Collisions Friday 1/7/05 Single neutron peak

  3. ZDC Energy (# of neutrons) vs CTB Sum (Multiplicity) for CuCu CTB (Mult.) Central

  4. Interaction Diamond for “Rebucketed Fill” Friday 1/7/05 Need to calibrate ZDC & BBC TACS using TPC Tracks. Data for this acquired Tuesday evening/Wed. morning.

  5. Backgrounds on Friday Jan.7 Look much Better than previous few overnights. Last evening: Yellow Background was significant in first fill. OK in second. 1/7 ZDCs 1/7 1/7 BBCs BBC Coin. Yellow Back. Blue Back

  6. Off Center CuCu Collision taken Tuesday evening, January 11, 2005.

  7. CuCu Collision taken Tuesday evening January 11, 2005.

  8. Summary • We’re working today to analyze some of the data we acquired last night with the TPC. We’ll use this to determine our timing cuts for the BBC and ZDC based vertex cuts in relevant min-bias Trigger components. Also to determine BBC Sum ADC threshold cuts. Hope to finalize these parameters prior to this weekend. • Iterative calibrations for both the BEMC and EEMC have started. Estimates are that this process will take about a week. • DAQ, Run Control, and Trigger working well. We had multiple sub systems in runs last night running multiple Trigger components simultaneously. • Still discussing what action to take regarding new (second) short in TPC IFC East. If we determine we need to make some internal measurements, the time estimate is ~ 18 hours (likely “phasing” problem with Carpenters).