1 / 7

Andrew.Hill@eurocontrolt

Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 OLDI Issues. Andrew.Hill@eurocontrol.int. OLDI data impacted by 2012 FPL. 1. Equipment Capability and Status 4 Items currently specified in OLDI messages Mandatory RVSM

rbarham
Télécharger la présentation

Andrew.Hill@eurocontrolt

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation to ICAO WorkshopKiev 28 July – 1 July 2010EUR RegionalImplementation of Flight Plan Amendment 1 for 2012OLDI Issues Andrew.Hill@eurocontrol.int

  2. OLDI data impacted by 2012 FPL 1. Equipment Capability and Status • 4 Items currently specified in OLDI messages • Mandatory • RVSM • 8.33 KHz/UHF • Bilaterally agreed • Mode S • B-RNAV/P-RNAV 2. Co-ordination point and Route- Reference point for range and bearing

  3. Current OLDI (Edition 4.1) • Equipment capability and status in Basic messages (ABI, ACT, etc.) • RVSM- letter W • 8.33 KHZ/UHF- Letters Y/U • Mode S - Letters S and I • B-RNAV/PRNAV- Letters R and P • Fix (three letters) for reference point for range and bearing

  4. OLDI after FPL 2012 • Equipment capability and status in Basic messages (ABI, ACT, etc.) • RVSM - letter W- no change • 8.33 KHZ/UHF - Letters Y/U no change • Mode S- Letters E, H, I, L and S • B-RNAV/PRNAV- Letter R for PBN approved and combination of letters and digits in Item 18 • Significant point (five letters) as reference for range and bearing (as co-ordination point or in route description)

  5. System changes • Neighbours’ plans will impact system changes • Depending on level of implementation and dates for migration a translation function might be required • Local operational concept will have an impact (e.g. use of RNAV information for route allocation) • Transition will be managed at local level and should be planned and co-ordinated with neighbours as early as possible

  6. Schedule for producing new OLDI Edition “New” OLDI Edition END 2010 NOW Formal Approval/Release Draft changes ORAS Approval 1st quarter 2010 ORAS-TF/2 2nd quarter 2010

  7. Questions?

More Related