An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EFCOG Safety Working Group (SWG) Status June 7, 2016 EFCOG Working Group Coordination Meeting Washington, DC John McDonald, SWG Chair

  2. SWG Purpose • Assist member companies operating DOE/NNSA projects in attaining and maintaining the highest levels of operational, regulatory, and safety performance • Promoting best practices • Facilitating the exchange of operating experiences, benchmarking, and information • Access to SMEs in activities such as review of DOE standards and policies • Identifying opportunities to save and/or avoid costs • Assisting member companies in implementing effective safety and regulatory programs • Arranging for training and awareness workshops to enhance the competency of SMEs

  3. SWG Subgroups/Task Groups* *excluding Engineering Processes, currently in transition to be included in the 2017 SWG AWP

  4. SWG Contractor Leadership

  5. SWG Special Emphasis Areas • Annual evaluation of SWG • High quality Annual Work Plan (AWP) • Strong subgroups with good participation • Integrate Engineering Processes Subgroup • NNSA/Lab participation • Contractor Assurance System (CAS) • CAS task team established • Meet with customer to determine expectations • Feedback from DOE to get clarification • Determine deliverables and schedule • Add deliverables to AWP

  6. SWG Assessment • DOE Liaison and POC support is excellent • Contractor participation is excellent • EFCOG sponsor participation is excellent • Objectives of the SWG are being accomplished • AWP progress is acceptable (On track for high percentage of task completion this FY) • Opportunities for Science and NNSA increasing • Subgroups are teaming and improving effectiveness • Leadership Opportunities • ISM SG Vice Chair • QA SG Vice Chair

  7. SWG Activity Recent Highlights • QA JSEP/MASL Supplier List • Safety culture assessment guide • Electrical safety guides and awareness material • Laser Worker training material • NTS Best Practices (2) • Assists Enforcement Coordinators in recognizing repetitive and programmatic non-compliances • How to clearly communicate the nature of a noncompliance, the context in which it existed, and the associated causes and corrective actions

  8. SWG Activity Summary • Subgroups: 7 • Task Groups: ~20 • FY16 AWP: ~60 deliverables • Estimated membership: ~600-900 • Subgroup meetings FY 2016: ~8 + task group meetings and calls

  9. Completed 2016 AWP Tasks • 1.1.1 “Reporting Programmatic and Repetitive Noncompliances in the Noncompliance Tracking System (NTS) and the Safeguards and Security Information Management System (SSIMS)” Best Practice - Provides guidance on whether a noncompliance or set of noncompliances are programmatic or repetitive • 1.1.2 “Attributes of a Good NTS Report” Best Practice - Provides specifics on how to clearly communicate the nature of a noncompliance, the context in which it existed, and the associated causes and corrective actions • 1.2.3 Provide Enforcement Coordinator contractor awareness briefing in support of Annual Enforcement Workshop • 1.3.1 Identify nuclear safety, worker safety & health, or security requirements for summaries or enforcement aids that can be utilized when evaluating potential non-compliances

  10. Completed 2016 AWP Tasks • 2.2.3 Create list of nuclear SMEs to expedite performance of work and share information • 2.3.2 Review DOE Standards and Handbooks, including: • DOE-STD-1189, Integration of Safety Into the Design Process, the Hazard & Accident Analysis Handbook, • DOE Guide 424.1-1B, Implementation Guide for Use in Addressing Unreviewed Safety Question Determinations • 2.3.3 Review NNSA and DOE-AU 2016 nuclear safety R&D projects

  11. Completed 2016 AWP Tasks • 3.1.2 Best Practices on DOE-NTC Laser Safety Course, and ANSI Z136 laser safety standard - Evaluation performed • 5.1.1 QA Graded Approach Matrices • 6.4.1 HPI Coaching White paper • 6.5.1 Safety Culture Self-Assessment Process Guide • 6.6.1 Safety Culture Monitoring Best Practice

  12. Recent Operational Meetings • Nuclear and Facility Safety Meeting – February/ Albuquerque • Engineering Processes (EP) Subgroup Welding Task Team – March/Oak Ridge National Laboratory • Electrical Safety Task Group participated in the 2016 IEEE Electrical Safety Workshop – March/ Florida • Worker Safety & Health Subgroup Meeting – March/ Washington DC • ISMS and the QA Subgroups Meeting – April/Argonne National Lab • EP Fire Protection Task Team – May/Las Vegas • Regulatory & Enforcement Subgroup – May/Las Vegas

  13. Upcoming Operational Meetings • NFS and Engineering Subgroups - Argonne National Laboratory (ANL) on AUG 06-12 • Worker Safety & Health and Sustainability & Environment Subgroups – LLNL on OCT 18-20 • Regulatory & Enforcement Subgroup Meeting - Nevada National Security Site on OCT 25-27 • ISMS and QA Subgroups - Nevada National Security Site/ EM QA Corporate Boardon OCT 31- NOV 3