Production Methods

Production Methods. Waterfall Agile Scrum XP Kanban Hybrid. Production Methods. Design Documents Technical Documents Staff availability Risk list Task breakdown estimates Design, Art, Code, Audio Leads. Inputs. RELEASE. DESIGN. BUILD. TEST. Waterfall.

reid
Télécharger la présentation

Production Methods

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production Methods

  2. Waterfall • Agile • Scrum • XP • Kanban • Hybrid Production Methods

  3. Design Documents • Technical Documents • Staff availability • Risk list • Task breakdown estimates • Design, Art, Code, Audio Leads Inputs

  4. RELEASE DESIGN BUILD TEST Waterfall

  5. Task list, dependencies, resource • Microsoft Project • Spreadsheet Tasks are detailed and rigid Waterfall

  6. Gantt Chart

  7. DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST RELEASE RELEASE RELEASE Scrum

  8. Sprint

  9. Product Backlog • Sprint Backlog

  10. DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN DESIGN BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD BUILD TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST TEST RELEASE RELEASE RELEASE Scrum

  11. Scrum ‘Feature’ Team

  12. Daily Scrum • Who is in it? • How long will it take? • What do we say? • War room

  13. Scrum of Scrums

  14. Burndown

  15. Story Points • Ideal Days • Velocity • How much effort can X deliver in sprint? Estimation

  16. Pros • Agile / Adaptable • Feature based • Team ‘owns’ work • Cons • Work slips easily • ‘Soft’ deliverables • Dependencies are lost Scrum vs Waterfall

  17. Waterfall as manager • Waterfall: manages Sprints • Waterfall: ‘defined’ work • Waterfall: dependencies • Waterfall: External work • Scrum: for ‘creative’ / ‘research’ Hybrid