PCBs Total Maximum Daily Loads

PCBs Total Maximum Daily Loads. San Francisco Bay. Fred Hetzel SFB-RWQCB May 13, 2003. Polychlorinated Biphenyls (PCBs) Impairment of San Francisco Bay. PCBs on 303(d) list due to interim health advisory for fish consumption

revar
Télécharger la présentation

PCBs Total Maximum Daily Loads

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PCBs Total Maximum Daily Loads San Francisco Bay Fred Hetzel SFB-RWQCB May 13, 2003

  2. Polychlorinated Biphenyls (PCBs) Impairment of San Francisco Bay • PCBs on 303(d) list due to interim health advisory for fish consumption • U.S. EPA California Toxics Rule-Human health risk assessment for fish consumption sets a total PCBs criteria in water at 0.00017 µg/L

  3. PCBs Used in a Wide Range of Products • Closed applications • Capacitors and transformers • Heat transfer and hydraulic fluids • Open applications • Plasticizers • Surface coatings and paints • Flame retardants • Inks and adhesives • Pesticide extenders • Carbonless duplicating paper

  4. Large Mass of PCBs in the Bay due to Past Activities

  5. TMDL Linkage Analysis • Link sources to endpoint • Pollutant fate, transport, and effects processes • Conceptual models

  6. Generic Conceptual Model of PCBs Fate and Movement in Aquatic Systems (USEPA)

  7. Bioturbation, Scouring, Deposition & Resuspension, Transport, Dredging Atmospheric Deposition PCBs TMDLConceptual Model Golden Gate Outflow PointSources Surface Waters UrbanRunoff Fish eatingWildlife Fish Spills & On-LandContaminated Sites Benthic & Plant eating Wildlife Biologically Active Sediment Layer Benthic Invertebrates & Plants Non-UrbanRunoff &Non-Point Sources Buried Sediment Layer Humans Degradation, Sorption & Desorption, Diffusion DeltaInflow (Adapted from SETAC, 2002)

  8. Bioturbation, Scouring, Deposition & Resuspension, Transport, Dredging Atmospheric Deposition PointSources Golden Gate Outflow Surface Waters UrbanRunoff Spills & On-LandContaminated Sites Biologically Active Sediment Layer Non-UrbanRunoff &Non-Point Sources Buried Sediment Layer Degradation, Sorption & Desorption, Diffusion DeltaInflow Long Term Fate Model

  9. Surface Waters Fish eatingWildlife Fish Benthic & Plant eating Wildlife Biologically Active Sediment Layer Benthic Invertebrates & Plants Buried Sediment Layer Humans Food Web Model

  10. Proposed Numeric Targets for PCBs • Fish tissue = 23 parts per billion Based on human health risk assessment • Sediment = 2.5 parts per billion Based on generic bioaccumulation factors Not specific to San Francisco Bay

  11. PCBs Sources to the Bay • Atmospheric deposition • In–Bay sediment “hot spots” • Dredging • Treated wastewater • Delta inflow • Urban runoff & on land “hot spots”

  12. Proposed PCBs Allocations • Background and atmospheric deposition - 0 • Hot spots - Sediment target (phased approach) - Source investigations • Dredging - Sediment target (phased approach) - Source investigations • Treated effluent - Current mass • Run-off - Sediment target (phased approach) - Source investigations

  13. Limited Options for Reducing PCBs Loads

  14. Margin of Safety • MOS incorporated implicitly in the implementation and monitoring plans • Adaptive management approach to implementation

  15. Sediment PCBs Concentrations • Target = 2.5 parts per billion • Current ambient = 20-35 parts per billion • Near-shore ambient = higher ?

  16. Target? Target? TMDL Target(s) and Implementation Action Objective Effort ($,time,…)

  17. TMDL Adaptive Implementation (NAS, 2001)

  18. PCB TMDL Implementation • Immediate actions • High degree of certainty • Fixed time period • Monitoring program • Assess progress toward targets • Refine loading estimates • Studies (experiment ?) and model refinement • Validate key assumptions • Determine long term actions • Resolve key uncertainties ? • Review targets, allocations, and implementation