DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change

DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change. PHASE 1A. The project consists of 7 total phases 1a thru 3b Phase 1a Begins on the east end of the project early 2010, west end begins mid 2010 Phase duration approximately 550 days

rhys
Télécharger la présentation

DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DFW Connector ProjectMain Street BridgeStarting in March 2010Subject to Change

  2. PHASE 1A • The project consists of 7 total phases 1a thru 3b • Phase 1a • Begins on the east end of the project early 2010, west end begins mid 2010 • Phase duration approximately 550 days • Many stages within phase 1a • Major areas of work include: • West end: FM 1709 – SH 26 • TX 121 SB & NB widenings • Managed lanes: Texan Trail – International Pkwy • North east frontage roads • Main Street bridge

  3. Main Street Bridge • Work commences March 2010 with asbestos abatement • NORTHGATE COLOR SCHEME for following maps: • BLUE = DETOUR CNST • YELLOW = CURRENT CNST • ORANGE = PREVIOUS CNST

  4. CONCEPTUAL PHASING

  5. CONCEPTUAL PHASING

  6. CONCEPTUAL PHASING

  7. CONCEPTUAL PHASING

  8. CONCEPTUAL PHASING

  9. CONCEPTUAL PHASING

  10. DFW Connector Traffic Management • Goals of MOT team • Maintain mobility • Cooperation with stakeholders • Safe construction zone • Emergency / incident management • Contacts • Emergency assist • Location (mile) markers • Emergency pullouts • Courtesy patrol