710 likes | 989 Vues
AGENDAIntroduction to Scotoil Group
E N D
2. AGENDA
Introduction to Scotoil Group & Scotoil Services
Equipment subject to NORM - ‘Rogue’s Gallery’
Equipment Decontamination Procedure
Step by Step, Aberdeen
Disposal Route - Compliance with Regulations
Scotoil - Oilfield Environmental Services
Equipment Decontamination Procedure
Step by Step, Cairo
QUESTIONS ?
3. EUROPE
Scotoil Group plc headquarters in Aberdeen, Scotland
4. More than 20 years’ experience
5. OUR CLIENTS Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
6. Equipment decontamination
7. High Pressure
Generally for component parts and tubulars
Ultra High Pressure - Trials
More efficient tubular cleaning
Increased throughput
More effective cleaning of lead contaminated tubulars
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
8. Disposal facility regulated by SEPA
10. Radiological surveys
11. Formation water contains naturally-occurring mineral salts Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
12. Specific Activity
Activity per gram i.e. Bq/gram
13. Measured in sieverts { large unit} - usually prefix sub multiplier e.g.1 µSv {micro sievert}
14. Naturally occurring radioactive material is a major issue for
field operation
decommissioning Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
15. Colour varies from white through to brown
16. Radiation dose
37. Step by Step Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
38. Written notification from the Operator of NORM consignment
Identified offshore by platform/rig RPS
Scotoil authorised to accept contaminated equipment
Contamination levels monitored on arrival Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
39. Unload equipment into Controlled Area
Enter job details on computerised Job Register
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
40. Scale sample passed to Laboratory
Radiological analysis, total activity, type of scale
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
41. Arrival, Documentation Check & Inspect
Tubulars - check internal, external pin, box, scale thickness, activity for each joint
Unique Job No - waterproof tag, client, location
Complete monitoring records for each item or
component part
All joints capped or re-wrapped
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
42. Decontamination of Equipment
Pre-cleaning prior to stripdown
Stripdown if required
Soluble abrasives can be used to assist decontamination
Full decontamination
Post, Final & QC Inspection
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
43. Ultra High Pressure Pump Unit
36,000 psi working pressure at 42 litres per minute
High Pressure Aqua Pumps
10,000 psi working pressure at 82 litres per minute
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
44. Tubular Decontamination System
High Pressure jetting combined with lance mounted cutter ‘Rattler head’
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
45. Tubular Ends - Fully Enclosed Hoods
All Scale & cleaning
water collected to sump
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
46. Tubular Ends - Fully Enclosed Hoods
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
47. Lance Mounted Cutter Head
‘Rattler’
Machine with hardened
cutting surfaces
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
48. All Scale ground down to less than <250 microns
All Scale passed through screens
Oil Separator - two stage
Controlled discharged to sea regulated by SEPA
Post Cleaning Monitor Record
Final Check Monitor Record
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
49. Results of radiochemical analysis on computerised Job Register
Certificate of Scale Disposal - master job file
Quarterly Scale Disposal computerised records
Quarterly Sea Survey - results, particle size analysis to radiation specialists at SEPA (Scottish Environment Protection Agency)
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
50. Compliance with HSE Regulations
Ionising Radiation Regulations 1999
Control of Pollution Act 1974*
Radiation Substances Act 1993
Environmental Pollution Act 1990
Registered under the pipeline Act 1962
Authorisation for the Accumulation and Disposal of Radioactive Waste*
* Regulated by SEPA (Scottish Environment Protection Agency)
Project teams combine partner knowledge and Scotoil expertise to create a powerful combinationProject teams combine partner knowledge and Scotoil expertise to create a powerful combination
54. ON ARRIVAL, THE CONTAMINATED ITEM IS OFFLOADED AND DIRECTED TO OES RADIATION CONTROLLED AREA.
57. THE EQUIPMENT IS DISMANTLED BY EITHER OES PERSONNEL
OR A SPECIALIST THIRD PARTY;
RADIOLOGICALLY SUPERVISED BY OES.
58. EACH PART IS GIVEN AN INDIVIDUAL IDENTIFICATION NUMBER,
MONITORED AND TAGGED.
59. THE BREAKDOWN AREA IS DECONTAMINATED, FLUSHING ALL
CONTAMINENTS INTO THE CLOSED LOOP DRAINAGE AND
FILTRATION SYSTEM.
60. EACH PART IS INDIVIDUALLY DECONTAMINATED
61. STATE OF THE ART UHP WATER JETTING EQUIPMENT.
62. RESULTING RADIOACTIVE WASTE IS COLLECTED IN
A CLOSED LOOP SIX STAGE FILTRATION AND
WATER RECYCLING SYSTEM.
63. FOLLOWING DECONTAMINATION, EQUIPMENT IS MONITORED
AND SURVEYED FOR VISUAL SCALE. IF ACCEPTED, INTERIM
CHECK TAPE IS ATTACHED TO THE EQUIPMENT.
64. EQUIPMENT IS NOW MONITORED BY A HEALTH PHYSICIST
AT THE QUALITY CONTROL STAGE.
65. FOLLOWING ACCEPTANCE BY THE QC DEPARTMENT AND
CLIENT, THE EQUIPMENT IS SUITABLY WRAPPED AND EITHER
BOXED, PALLETISED OR RETURNED TO ITS ORIGINAL CONTAINER.
66. THE EQUIPMENT IS CLEAN, SAFE, CERTIFIED AND READY FOR
CUSTOMER UPLIFT.
67. THE FILTRATION SYSTEM IS CLEANED, TRANSFERRING ALL
WASTE TO THE CLIENTS NORM STORAGE CONTAINER.
68. THE ENTIRE CONTROLLED AREA IS SURVEYED BY A QUALIFIED
HEALTH PHYSICIST TO ENSURE THAT IT IS FREE OF
CONTAMINATION.
69. WHEN EITHER THE QUANTITY OF NORM WASTE OR THE DOSE RATE HAS EXCEEDED A CERTAIN LEVEL, OES REQUEST THAT THE CLIENT AND THE EGYPTIAN ATOMIC ENERGY REMOVE THE WASTE FROM OES.
70. AT THE TIME OF EQUIPMENT DESPATCH, A FULL REPORT IS SUBMITTED TO THE CLIENT WITH ALL RELEVANT DOCUMENTATION. THIS TYPICALLY INCLUDES :
EQUIPMENT / PART RECORDS
WORK SUMMARY
DISMANTLING DETAILS
RADIATION ANALYSIS RESULTS FROM EACH STAGE IN THE PROCESS
RADIATION SUMMARY
QC DOCUMENTATION
NORM WASTE DATA
DECONTAMINATION CERTIFICATE