PBS-2000J Power Metering System. NARI Group Corporation 2016.8. 1. System Structure. 2. Technical Characteristics. 3. System Functions. 4. Applications of System. Proposed System Architecture of AMR. Master Station Hardware. PBS 2000 System Master Station Hardware:
E N D
PBS-2000J Power Metering System NARI Group Corporation 2016.8
1 System Structure 2 Technical Characteristics 3 System Functions 4 Applications of System
Master Station Hardware PBS 2000 System Master Station Hardware: • Application Servers • Database Servers with Disk Arrays • Data Acquisition Servers or Front End Servers • Workstations • Web Servers (if necessary) • Terminal Servers • GPS • Printers • Communication devices (switches & routers)
Private Network E1-LAN Dial Network Terminal Server RS-485 RS-232 Substation System with Terminal Server Proposed Acquisition way for Industrial consumers/ dispatching transformers • Acquisition Terminal • Meters are connected to Acquisi-tion terminals by RS-485 and communicate with master station through Acquisition terminals. • Terminal Server • Meters are connected to Terminal server through RS485 or RS232 and communicate with master station directly. Private Network E1-LAN Dial Network RS-485 Acquisition Terminal Substation System with Acquisition Terminal
Proposed Acquisition way for residential consumers • Meter with built-in GPRS module • Carrier Meter + PLC+ Concentrator • Meter+RS485 + Concentrator • Meter+RS485+Collector+PLC+Concentrator
Communication System • Network between Master Station and Acquisition devices • Telephone Network (PSTN) • Dispatch Data Network • GSM • GPRS/3G
1 System Structure 2 Technical Characteristics 3 System Functions 4 Applications of System
Technology Principles • Reliability • Security • Adaptability • Real-Time Response • System Openness
Reliability • Multi-level Clustering architecture protect system to avoid single-point failure. • Cluster of OS • Cluster of Data Base • Cluster of Application Servers • Cluster of Application programs • Group of Front-end Data acquisition • Dual-network Structure
Clusterof the Application Programs works New Task Task Processing
Reliability Security Adaptability Real-Time Response System Openness Technology Principles
Application Security1、User authorization based on password and IP-MAC binding. 2、Application and Data authorization.3、Support HTTPS.4、Flow management for important operation
Data Security1、Broken-point transfer resumption. 2、Local buffering of Acquisition Servers.3、Encryption of original data.4、RAID5 of OS and HA redundancy of DB
Reliability Security Adaptability Real-Time Response System Openness Technology Principles
Full Java programming Support platforms:UNIX(AIX HP-UX)LINUXWINDOWSmixed platform
Adaptability • Most Graphical User Interface based on B/S structure
Adaptability Component-based architecture • Support EJB、XML、WEBSERVICE in accordance with future technology trend
Reliability Security Adaptability Real-Time Response System Openness Technology Principles
processing processing processing Message Dispatcher Event-driven Model Asynchronous Message processing
Reliability Security Adaptability Real-Time Response System Openness Technology Principles
System Openness System Model Based on IEC61970、IEC61968、SG-186 Standard ERP SG-186 61970 61968 61970 61968 DMS EMS CIM XML CIM XML Power Metering System DL698.41
System Openness • Modularized implementation of communication protocol, supporting • IEC60870-5-102 、IEC62056 (DLMS) 、 • IEC 61107 and EDMI Energy Meter terminal unit etc .
1 System Structure 2 Technical Characteristics 3 System Functions 4 Applications of System
PBS-2000JSystem Functions Overview • Data acquisition • Data statistics • Data calculation • Data validation • Data analysis • Bypass substitution • Multi-data source management • Repot • System analysis • Data inquiry • Device management • Acquisition event management • Parameter input • System management • Security management • Security management
1.Metering Data Acquisition • Collect metering data simultaneously from different plants and substations • Communication status monitoring and alarming • Multiple Acquisition servers, load-balancing and redundancy • Communication code display, communicationstatus statistic • Support broken-point transfer resumption and communication task automatic recovery • Modularized implementation of communication protocol, supporting IEC60870-5-102 、DLMS 、IEC 61107 and EDMI Energy Meter terminal unit etc .
1 Metering Data Acquisition • Measuring Data: Power Consumption, Demand, Voltage, Current, Active and Reactive Power, Frequency, Phase Angle, Power Factor, etc. • Statistic Data: • Daily Extreme, Monthly Extreme, etc. • Event Records: • Change Time, Change Tariff, Change parameters, etc.
1.Metering Data Acquisition Snapshot for Communication code display
2.Metering Data Statistics • Statistics by year, season, month, week, day and hour • Statistics by categories ---power grids , regions ,substations & plants ,transmission lines and transformers . • Statistics by different voltage level ---500KV ,330KV,220KV,110KV and 35KV. • Statistics of the electricity input and output for power supply company. • User can define various periods as well as the start/end time
3.Power Data Calculation • User-defined formula • User-defined integral period of formula • Automatic formula generation according to power grid model • All calculated data support statistical function • Historical section management for calculation formula supported
4. Data Validation Integrity CheckRationality check Alarming service Data Re-Acquisition Data amendment Integrity check service Rationalitycheck service • Data exceed threshold • Unreasonable value • Large deviation comparingEMSdata • load exceed threshold • …… • Daily data • Month data • Curve data Data Processing
5. Data Analysis 1)Automatic form calculation models of line loss、power balance and transformer loss 2)Loss calculation by area、plant、line and device Index 3)Statistics of loss/power balance by day、month and year 4)Calculation of loss/power balance in user-defined period Acquisition Data Statistic data、Calculation data
6.Bypass Substitution 1)Bypass event auto-detect 2)Automatic and manual bypass substitution 3)Power balance calculation assistedbypass substitution judgment 4)Support cancellation and reverse recovery Auto Bypass Detect • Auto substitution • Manual Substitution
Data from EMS Data from subsidiary meter Forwarded Data … Data from the other endpoints of same line 7.Multi-Data Source Management 1)Support multiple data sources. 2)Automatic data replacement by priority or manual data replacement 3) data verification by multi-source data Substitution Verification Multi-data source
9.System Analysis • List of fault terminal devices • List of fault terminal servers • List of fault meters • List of abnormal meter event • Bypass switching
10. Data Inquiry • Primary and subsidiary meter data inquired separately • Flexible multi-level navigated inquiry mechanism • Detailed information integration • Calculation data inquiry organized by area, plant, substation, device
11.Device Management Function • Change CT/PT • Replace meter • Meter’s parameter management
12.Acquisition Event Management • Classified management of acquisition event (meter event, terminal event, channel event, substation event,etc) • Manage acquisition events by different level (information, alarm, fault) • Manage acquisition events by area , plant and substation • Flexible configuration of acquisition events
13.Parameters Input • Parameter step-by-step input and display conform to IEC61970CIM structure • Clear structure and easy input • Many kinds of automatic generation functions helps generating relevant information and simplifying the typing work