This document summarizes the status of device production within the clean room for the LHCb experiment and highlights the current testing phases for various designs. Key points include the snake design undergoing tests, issues with the straight design related to dicing pressure, and poor coating resulting in small holes in silicon for NA62. Additionally, we note progress on frame preparations for gluing and dicing for ALICE and highlight issues with dual banana KOH inside channels, which showed surface cleanliness problems, leading to failed pressure tests and bonding concerns.
E N D
STATUS IN THE CLEAN ROOM Device production
LHCb – Snake design IN TEST LHCb – Straight design BAD DICING PRESSURE TEST BAD COATING littleholes in Si
NA62 – Frame 2 READY FOR GLUING READY FOR DICING ALICE
NA62 – Dual Banana KOH insidechannels SURFACE NOT CLEAN! PRESSURE TEST BAD BONDING SEM PICTURES…