Biomethane and the Renewable Heat Incentive. Andy Morrall Manager – Non-domestic RHI 27/01/2014 RHI.enquiry@ofgem.gov.uk 0845 200 2122. Overview. Key requirements Payments Application process Regulatory changes. Key requirements.
E N D
Biomethane and the Renewable Heat Incentive Andy Morrall Manager – Non-domestic RHI 27/01/2014 RHI.enquiry@ofgem.gov.uk 0845 200 2122
Overview Key requirements Payments Application process Regulatory changes
Key requirements The Regulations define injection as ‘the introduction of gas into a pipe-line system operated by a gas transporter’. • Injection must have commenced before an application can be made • No grant funding • Metering and measurement requirements: • Volumes • GCVs • Heat • How biomethane is produced: • Feedstocks: for AD, solid/liquid biomass, liquid waste only • Upgrade process The Regulations define gas transporter as ‘the holder of a license granted under section 7 of the Gas Act 1986(1)’.
Where : Ais the biomethane tariff B is the kWh of biomethane injected in any quarterly period; C is the kWh of propane contained in B; D is the kWhth of heat supplied to the biogas production plant (other than heat contained in feedstock to produce biogas by anaerobic digestion) which produced the biogas from which the biomethane was made, from any heat source other than heat generated from the combustion of that biogas; E is the kWhth of heat supplied to the biomethane production process; and F applies only in relation to biomethane made using biogas produced from gasification or pyrolysis, and is the proportion of biomass contained in the feedstock used in the relevant quarterly period to produce the biogas.
The application process • Managed online via the RHI register • Each applications has 2 levels of checks before ‘Delegated Authority’ sign off • Ofgem liaise with applicant to ensure necessary information is provided. • Initial meter readings and measurements required – payments are (typically) calculated from the date of submission
Regulatory changes • Setting capacity in accordance with Network Entry Agreement • Additional capacity • Allowing preliminary registration • Heat supplied to biomethane production process • Granting Ofgem (and authorised agents) inspection rights