Facilities Update Site Improvements. Encinitas Union School District September 5, 2006. Capri. New HVAC system New campus entrance w/ student drop-off / pick-up Playground asphalt replacement and regrade. Moved in one relocatable to house Media Center during construction Next steps
E N D
Facilities UpdateSite Improvements Encinitas Union School District September 5, 2006
Capri • New HVAC system • New campus entrance w/ student drop-off / pick-up • Playground asphalt replacement and regrade. • Moved in one relocatable to house Media Center during construction • Next steps • Landscaping and irrigation at front of site • New marquee • Parking area • Media Center • Outdoor patio • Elevator • New stucco and painting
El Camino Creek • Completed three cottage-style classrooms • Next steps • Sandblast and repaint stairways • Replant slopes
Flora Vista • Preschool addition • Added two offices and one classroom • Replaced carpet with VCT • Replaced existing toilets • Remodeled main office • Remodeled principal’s office • Replaced school roof • Replaced lunch shade shelter • Sandblast and repaint windows • Next steps • Remodel existing storage • Add tack board to interior hallways • Replace asphalt (06-07) • Paint exterior of school (06-07)
La Costa Heights • Completing two new bathrooms • Added relocatable classroom • Next steps • Replace old playground equipment • Replace safety surfacing on playgrounds • Convert relocatables at back of site to cottage-style classrooms • Add modular cottage at front of site
Mission Estancia • Remodeled new computer room • Next steps • Replace tiles on outside walls • Move relocatables to south side of site and convert to cottage-style classrooms • Replace school roof (solar?) (06-07)
Ocean Knoll • Remodel auditorium • Remodel office entry • Conversion of HVAC plant to storage room • New ball wall • Playground asphalt recycled and replaced • Next steps • Add school sign • Asphalt striping
Olivenhain Pioneer • Added nine cottage-style classrooms on east side of site • Added three bathrooms • Replaced carpet, tile, and painted throughout site • Next steps • Complete sink in existing art room • Replace school roof (solar?) (06-07) • Replace HVAC (07-08)
Park Dale Lane • Office renovation • Next steps • Add modular cottage at east side of site
Paul Ecke Central • Renovate teacher’s lounge into kitchen and workroom • New computer lab • Replaced old portable classroom w/ cottage-style classroom • Next steps • Remodel auditorium • Add three classrooms adjacent to auditorium • Improve perimeter along Vulcan • Add student drop-off/pick-up on Vulcan • Renovate parking on west side of site
Next Steps… • Adoption of standardized classroom • Renovate playgrounds at all sites • Review facility priorities from 2004 • Site visits to determine current and future facility needs and priorities