1 / 9

2014 CIGRE Paris Session

A3-14(AG01)005 IWD. 2014 CIGRE Paris Session. Sunday 24 th – Friday 29 th August, 2014 Monday 25 th … General Assembly Tuesday 26 th … SC A3 meeting Wednesday 27 th AM … Poster session (Wednesday 27 th PM … JWG A3/B4.34 meeting)

rossa
Télécharger la présentation

2014 CIGRE Paris Session

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A3-14(AG01)005 IWD 2014 CIGRE Paris Session Sunday 24th – Friday 29thAugust, 2014 Monday 25th … General Assembly Tuesday 26th … SC A3 meeting Wednesday 27th AM … Poster session (Wednesday 27th PM … JWG A3/B4.34 meeting) Thursday 28th … Interview for contributions Friday 29th … A3 group discussion Saturday 30th … Technical Committee meetings PS1: Equipment to cater for changing network conditions PS2: Lifetime management and ageing of T&D equipment PS3: Impact of extreme operating conditions on T&D equipment CIGRE AG.01 meeting,Delft, Netherlands,12th March, 2014

  2. 2014 Sessions Friday 29thAugust Chairman Hiroki Ito Secretary Edelhard Kynast Special reporter PS1&3 Anton Janssen Special reporter PS2 Antonio Carvalho Session Secretary André Giboulet

  3. Interview for Contributors Thursday 28thAugust Chairman Hiroki Ito Secretary Edelhard Kynast Special reporter PS1&3 Anton Janssen Special reporter PS2 Antonio Carvalho Session Secretary André Giboulet Deadline for contribution: 1 month before the Session Number of contributions: around 50-55

  4. 2014 Poster Sessions Wednesday 27thAugust Chairman Hiroki Ito Secretary Edelhard Kynast Poster Chairman André Giboulet Deadline for posters: 1 month before the Poster Session There should be at least one person who know the contents of the papers. There will be new room for the Poster Sessions with more space installed on a dedicated level. A printer capable of A0 size copy will be available for posters. Some SC prefers to have only one time slot allowing all the papers. (Max.40) How to organize A3 posters with 28 papers and 12 WGs & SC.

  5. 2014 Group Discussion • 2014 Session Papers • 50 synopses submitted and 9 synopses sent to other SCs:B2/B3/D1/A2 • 41 synopses evaluated: NCA12, IA14, AA15 • A2(55), A3(41), B2(42), B4(43), B5(45) and C2(66) were competitive. • There was a guideline of Maximum 25 papers per SC but the rule is removed at final moment. Each chairman can select all the good papers. • A3 selected 28 papers: 16 for PS1, 8 for PS2, 8 for PS3 • This change will be a set of reform of group discussion system. • - Special report should not address questions to a particular report. • - The global number of questions of a Special Report should be limited. The optimum total number of questions are 15 (up to 20 at Maximum). • The guideline for questions: 10 for PS1, 5 for PS2, 5 for PS3

  6. 2014 Group Discussion Running Short presentation of the Study Committee by the Chairman Introduction of the Preferential Subjects by the Special Reporter Prepared contributions / Spontaneous contributions by the attendance Discussion and summary by the Special Reporter General conclusion by the Chairman Special reports Length: 8 pages, 15-20 concise questions, Deadline: Mid-May Contributors Intended contribution sent to the Reporter one month in advance The chairman and special reporters meet the contributors one day before the Group discussion, Collect all contributions. Daily summary Length: 300-500 words, One day after the Group discussion General report Length: 8 pages (3000 words), a few month after the Session / End-Nov.

  7. Acceptance and Reject of 2014 synopses 617 Abstracts proposed • 470 accepted / 147 rejected

  8. Statistics

  9. Future events 2015 Lund (Sweden) symposium on 25-29 May, 2015 Development of Power Systems and international integration of operations and markets, SC B4, C1, C2, and C5, Chairman: J. Vanzetta 2015 UHV (and EHV) colloquium in Montreal, Canada, every two years Two week later of 2015 SC A3&B3 colloquium in Japan: tbd 2015 SC A2 colloquiumin Shanghai, China on 20-25 September The colloquium has specific PS for SC A3 & B3 participations 2015 SC A3 & B3 colloquium in Nagoya, Japan on 28 Sept.-2 October SC A3 meeting is scheduled on 30 Sept.-1 October

More Related