CEAC Presentation Friday, April 23, 2010. Chris Crock. Aaron Lammers. Brent Long. Aaron Raak. Introduction. Carabuela, Ecuador has a Flawed Wastewater Treatment System Overloaded Septic Tank Failed Leaching Field Worked with HCJB to Remedy the Problem. Project Management. Client:

rue
Télécharger la présentation

CEAC Presentation Friday, April 23, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CEAC Presentation Friday, April 23, 2010 Chris Crock Aaron Lammers Brent Long Aaron Raak

  2. Introduction • Carabuela, Ecuador has a Flawed Wastewater Treatment System • Overloaded Septic Tank • Failed Leaching Field • Worked with HCJB to Remedy the Problem

  3. Project Management Client: Bruce Rydbeck Consultant: Tom Newhof Advisor: Leonard DeRooy Team Member: Christopher Crock Team Member: Aaron Lammers Team Member: Brent Long Team Member: Aaron Raak

  4. Project Management Group Meeting • Method of Approach • Decision Process • Task Division • Individual • Partner • Team Divide Tasks Individual Research Group Meeting Divide Tasks Individual Design

  5. Design Norms/Criteria • Effective Treatment • Culturally Appropriate • Sustainability • Site Appropriate • Low Cost • User Friendliness • Life of Design

  6. Requirements • Performance Requirements • Water Effluent • Coliform count < 1000/100 mL • BOD under 2.0 mg/L • Helminth eggs < 1 egg/100mL • (Who standards set E. coli limit for leafy crops at 1,000/100mL; at this level of treatment other pathogens are assumed to be treated as well) • Sludge Effluent • 1000 E. Coli/gram solids • < 1 Helminth egg/ g solids • (With alfalfa, requirements need to only meet Class B sludge treatment. The US EPA determined that sludge which goes through one of six processes of significant reduction of pathogens may be applied to crops)

  7. Requirements • Functional Requirements • Handle the waste of the entire population for 20 yrs (2700 ppl. for projected population) • No electricity • The system must fit in 0.5 hectares • No chemical additives • Shall not need experts outside of the village for construction

  8. General System Description • Bar Racks • Screen for large solids and objects • Two open channels with inclined bars • Dewatering plate for screenings • Grit Chamber • Settle out large particles (sand, grit, etc.) • Two open channels acting as grit chambers • Velocity control weir • Imhoff Tank • Settle out discrete organic materials and small particles • Store organics for later treatment • Anaerobic digestion of organic solids • Two tanks and settling chambers • Stabilization Lagoons • One facultative pond for BOD reduction • Two maturation ponds for further BOD reduction and pathogen removal • Sludge Drying Beds • Treat sludge from Imhoff Tank and Grit Chamber • Four sludge drying beds for treatment cycling

  9. Q = 196 m3/day BOD = 32 kg/day TSS = 40 kg/day General System Description Q = 196 m3/day BOD = 32 kg/day TSS = ? Q = 196 m3/day BOD = 32 kg/day TSS = ? Bar Racks Q = 196 m3/day BOD = 19.6 kg/day TSS = ? Grit Chamber Imhoff Tank Solids = ? Solids = ? Q = 196 m3/day BOD = 0.51 kg/day TSS = ? Sludge Treatment Irrigation Stabilization Ponds

  10. Design Decisions/Alternatives – Bar Rack • Bar Racks • Mesh screen fitted to the inlet of grit chamber • Difficult to maintain • Clogs easily • Damages easily • Mesh cage sitting on bottom of channel to catch large objects • Complicated to make • Costly to build • Inclined bars that are manually raked • Easy to maintain • Simple to construct • Fairly cost efficient

  11. Environmental Design - Bar Rack • Environmental Design • Important to remove larger solids and particulate • Bar Rack • Design depends mostly on clear space between bars • Velocity should be within 0.3—0.6 m/s • Openings between 20—50 mm • Rack for dewatering screenings • Redundancy accounted for

  12. Structural Design - Bar Rack • Structural Design • Bar Rack • Ultimate moment design • Uses minimum steel and cover • Two open channels and racks for redundancy • Two depressed steel plates for dewatering

  13. Design Decisions/Alternatives – Grit Chamber • Grit Chamber • Vortex Grit Chamber • Requires electricity • Costly to buy • Modified Vortex Grit Chamber • Not ‘proven technology’ • Does not require electricity • Cheap to make • Old Septic Tank • Cheap to modify • Too large to settle only girt • Difficult to maintain • Rectangular Open Channel • Does not require electricity • Easy to maintain • Requires manual labor • Fairly cheap to construct

  14. Environmental Design – Grit Chamber • Environmental Design • Important to remove larger solids and particulate • Grit Chamber • Design largely depends on the velocity the water (0.3 m/s) • Velocity controlled by sutro weir • Grit removed is treated in sludge drying beds • Redundancy accounted for

  15. Structural Design – Grit Chamber • Structural Design • Grit Chamber • Ultimate moment design • Uses minimum steel and cover • Two open channels and sutro weirs for redundancy

  16. Design Decisions/Alternatives – Imhoff Tank • Septic Tank • Pros - Simple, Durable, Little Space • Cons – Low efficiency, odors, already failed system • Lagoon System • Pros - Simple, Flexible, Little Maintenance • Cons – Large open land, odors, mosquitoes • Imhoff Tank • Pros – Durability, little space, odorless effluent • Cons – Less simple, regular desludging

  17. Environmental Design – Imhoff Tank • Environmental Design • Two tanks in one structure for redundancy • Sedimentation • Based off Design guides and rules of thumb • Overflow Rate of 600 gal/ft2 day (Tchobanoglous) • Retention Time of 2 hours (DEWATS) • Clearance, overlap, other recommended dimensions • Digestion • Based on case study of Imhoff tank in Honduras • Sludge storage for 1.87 ft3 per resident (3,370 ft3) • Up to 6 months of sludge storage

  18. Structural Design – Imhoff Tank • Structural Design • Analysis of forces and moments in tank • Finite Element Analysis for Sedimentation walls • Structural analysis for primary load bearing walls and beams • Designed steel and concrete to hold for highest loads • ACI 318M-05 –Metric Building Code and Commentary • Minimum reinforcing • Minimum/maximum spacing • Minimum cover • Vertical and horizontal reinforcing based on analysis • Similar to case study tank in Honduras

  19. Design Decisions/Alternatives - Lagoons • Facultative Lagoon • Simpler Setup • Less Maintenance • More Land • Less Expensive • Aerated Lagoon • Mechanical aerators to enrich wastewater with oxygen • Better Removal Rates • Less Land • Expensive

  20. Environmental Design – Lagoons • Used Kinetics, Temperature Factors, and Hydraulic Residence Times to Size Lagoons • Loading Rates • BOD: 100mg/L • Helminth Eggs: 1000 Eggs/L • E-Coli: 2e7 Coliforms/100mL • Reduced Rates • BOD: 2.7mg/L • Helminth Eggs: 0.10 Eggs/L • E-Coli: 915 Coliforms/100mL

  21. Structural Design – Lagoons • Pond System • 1 Facultative Ponds • 2 Maturation Ponds • Dimensions • 21 meters x 21 meters • Depths of 1.5 meters and 0.5 meters • Redundancy

  22. Design Decisions/Alternatives – Sludge Treatment • Open sand drying beds • Covered sand drying beds • Drying lagoon • Decision:Open beds • Lower cost • Effective treatment

  23. Environmental Design – Sludge Treatment • Must hold sludge for several weeks to dewater • Must hold sludge for longer to make it safe for fertilizer • Designed to hold 1 year’s worth of sludge for Imhoff tank • Area: 960 m2

  24. Structural Design – Sludge Treatment • Beds have a layers of sand and gravel • Shear gates to control sludge flow • Low walls of earth or concrete • Underdrain system of PVC pipe

  25. Hydraulics • Townspeople connect roof drains to sewers • A large rainfall event could flush the system • Model showed 15x increase in flow during 10-year event • Will require an overflow weir to prevent flushing

  26. Hydraulics • Storm inflow: 3100 m3/day • Design inflow: 196 m3/day

  27. Grant Proposal • Estimated cost of construction = $25,000 • Probably too much for residents • We are applying to HCJB for a grant to cover the cost of construction • Maintenance costs to be covered by Carabuela • Estimated $14,000/year

  28. Questions??