1 / 3

HAROP Status of project 09/10/2007

HAROP Status of project 09/10/2007. HAROP. Status of project 1/2. HAROP – HArmonized Radio Operations Procedures for GSM – R Projectmanager : Eric Prétet The situation today :

sabina
Télécharger la présentation

HAROP Status of project 09/10/2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HAROP Status of project 09/10/2007

  2. HAROP Status of project 1/2 • HAROP – HArmonized Radio Operations Procedures for GSM – R • Projectmanager : Eric Prétet • The situation today : • The harmonisation of driver reaction following a GSM R emergency call is discussed in the Operations Support Group of the CER • The discussions show the interest to define the « proceed on sight » (or « marche à vue » or « run on sight ») in an european harmonised way and to implement this harmonised « proceed on sight » in every european railways

  3. HAROP Status of project 2/2 • Prospects : • Contribute to the works concerning the harmonised « proceed on sight » by proposing a rule that could be validated on the european level • Support the on going works concerning the GSM R Railway Emergency Call in the CER OPE Support Group

More Related