1 / 16

ARIZONA STATE RAIL PLAN

ARIZONA STATE RAIL PLAN. AASHTO Subcommittee on Rail Transportation September, 2010. Statewide Planning Process. ADOT Planning Process Evolution. Sun Corridor Megaregion. Sun Corridor will include 85% of state population by 2050 Two-thirds of housing units yet to be built

salome
Télécharger la présentation

ARIZONA STATE RAIL PLAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARIZONA STATE RAIL PLAN AASHTO Subcommittee on Rail Transportation September, 2010

  2. Statewide Planning Process ADOT Planning Process Evolution

  3. Sun Corridor Megaregion • Sun Corridor will include 85% of state population by 2050 • Two-thirds of housing units yet to be built • Half of the Transportation Infrastructure to be built • Opportunity for new sustainable urban development paradigm Flagstaff Prescott Phoenix Yuma Tucson Nogales Source: Maricopa Association of Governments

  4. Southwest Transportation Network • Strong E-W connections • Connectivity with LA / Long Beach Ports • Need for better N-S network

  5. Existing Rail Network • Two Class I Transcontinental Routes • Phoenix Metro Area served by Subdivisions • Connection to Mexico at Nogales

  6. State Rail Plan Outline • Rail Vision and Benefits • Goals, Objectives, and Rail benefits • Inventory of Existing Conditions • Issues, Opportunities, and Needs • Passenger Service • Network Requirements • Safety and Congestion Mitigation • Prioritization of Proposed Rail Actions • Potential Rail Actions • Recommended Priorities • Implementation Plan • Potential Funding Strategies • Appendix

  7. Issues and Opportunities • Passenger Rail Service • Intercity Rail Service (including Amtrak) • High Speed Rail • Commuter Rail • Tourist Railroads • Network Requirements • Transcontinental Corridors • Intermodal and distribution systems • Class I Branch and Shortline Railroads • Safety and Congestion Mitigation • Grade Separations and Safety Improvements • Capacity enhancements

  8. Passenger Rail Priorities • Intercity and Commuter Rail System • Intercity Rail provides transit backbone for Sun Corridor • Prescott/Flagstaff to Nogales • Phased Implementation • Phoenix to Tucson highest priority • PHX-TUC Intercity AA Study • Seamless coordination with Commuter Rail

  9. Passenger Rail Priorities • Establish a Western High Speed Rail Network • Obtain Federal Designation • Complete Feasibility and Route Studies • Possible connections to California, Nevada, and New Mexico • Partner with adjacent state DOTs / Western HSR Alliance

  10. Other Passenger Rail Opportunities • Partner with Class I Railroads to implement operational improvements along branch lines • Enhancements along BNSF Phoenix Subdivision (Peavine) • Rehabilitation of UPRR Wellton Branch • Efficiency improvements along UPRR Nogales Subdivision • Partner with Amtrak to improve existing service • Southwest Chief (BNSF) • Sunset Limited (UPRR) • Provide service to Phoenix Metro Area

  11. Recommended Implementation • Short Term (within 5 years)

  12. Recommended Implementation • Intermediate Term (within 10 years)

  13. Recommended Implementation • Long Term (within 20 years)

  14. Funding Options • Federal Funds • FRA High Speed Rail Grants • New Federal Funding via Re-authorization • FHWA Surface Transportation Program • FHWA Section 130, Grade Crossing Safety Improvements • FHWA Congestion Mitigation and Air Quality (CMAQ) Funds State & Local Funds • State & Local Match Options

  15. Additional Information & Assistance: Arizona Department of Transportation Multimodal Planning Division Shannon L. Scutari, Esq.Director, Rail & Sustainability Services 602.388.0719sscutari@azdot.gov Mike Normand, AICP Director of Community & Grant Services 602.712.8243 mnormand@azdot.gov Michael Kies, AECOM Consultant PM – State Rail Plan 602.337.2595 Michael.kies@aecom.com

  16. Websites: www.bqaz.gov www.whatmovesyouarizona.gov

More Related