The ENGR-1020 Wind Turbine Project aims to design and construct an improved Picoturbine utilizing hard drive magnets. Team members, skilled in electrical, civil, and computer engineering, will develop a weatherproof turbine with a no-load voltage three times greater than traditional designs. The project involves building a larger turbine from a purchased kit, including new wind coils, while ensuring vibration reduction and low coil resistance. The timeline includes key milestones leading to testing by Thanksgiving. Jerry Bernardini leads the project initially, ensuring team collaboration and innovation.
E N D
Project Overview ENGR-1020-100 Fall 2007 Wind Turbine Team 1 Jerry Bernardini
Project Goals • Design and build a Picoturbine improved wind turbine • Build the turbine with used hard drive magnets • The no-load voltage will be three times the Picoturbine • The turbine will be weather proof • Project ready for testing by Thanksgiving
Project Team and Skills • Jerry Bernardini - Electrical Engineering Major • Electrical circuits • Tom Jones – Civil Engineering Major • Wood working • Billy Joel – Computer networking Major • Spread sheets and ideas • Clark Gable – Acting Major • Presentations and reports
Project Description • A purchased kit was built and tested • The kit parts used as part of a larger turbine • Magnets obtained from hard drives • Wind new coils • Test new magnet coil combination • Build wind capture section • Complete construction • Test
Technology Features • Moving Permanent magnets • No commutate needed • Coils wound to 400-turns with 20 Gauge wire • More voltage • Lower coil resistance • Wood turbine construction • Vibration reduction • Easy to modify
Team Procedures • Jerry is the leader for the first seven weeks • Frank is the leader for the last seven weeks • Highlight any procedural differences from regular projects of this type • Discuss requirements, benefits, and issues of using new procedures • E-mail during week • Meet before every class • Exchange Engineering Journal sketches and notes
Schedule • High-level schedule milestones Phase 1 Picoturbine Phase 2 Phase 3 Sep Nov Dec Oct
Current Status • High-level overview of progress against schedule • On-track in what areas • Behind in what areas • Ahead in what areas • Unexpected delays or issues • Wire for new coils are delayed