An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GCRC Informatics Project February 24, 2005 6th Spring Presentation Sponsor: Dr. Paul Harris, GCRC Informatics Director Members: Chris Heath, BME/EE Adam Nagel, CompE Chris Nash, EE Brendan Soar, CompE

  2. Progress This Week • Added more functionality, robustness to program • Identified even more issues to address • Began documentation process for Dr. Harris • Implemented system on completely new components to ensure portablility • Ran into problems with network connections

  3. Added Functionality • Better GUI • Ensured protection of data file on PDA in case of program crash • Created failsafe algorithm to deal with loss of Bluetooth connection. • Fixed other issues • Exiting at certain points • Dynamically changing timing scheme • Problem with 1st Measurement

  4. Bluetooth Failsafe Algorithm

  5. Documentation • Created “Install” CD with all prerequisite software • Went through entire process with Dr. Harris and Carlos • Took screenshots, recorded action for creation of typed User’s manual • Part of required deliverables to Dr. Harris at end of semester

  6. Exported System • Dr. Harris’s PC • HP iPAQ Pocket PC • Previously unused monitor • Issues with Bluetooth on different model PDA

  7. New Functions to Add • Setup Bluetooth independently of PDA model • Create “stop bp acquire” button • Create other Vis • HR only acquire • Remote control • Compatibility with other models • Other GUI features

  8. “Showstopping” issues with DALP • Code won’t compile for Windows Mobile platform • Pre-compiled DALP DLL not compatible with LabVIEW functions • Difficulty learning how to use a class from a linked library • Shift in focus • Developing alternative approaches to uploading data

  9. First AlternativeUse a desktop as a Bluetooth link • Advantages • Involves mostly proven components • Simple server VI application due to “data dump” method • Disadvantages • Requires modification of solution requirements • PDA must be returned to central location • More complex procedure for users

  10. Second AlternativeUse a desktop as an 802.11x link • Advantages • In line with original solution requirements • No “data dump” or extra steps required for nurses • Real-time monitoring of study progress • Disadvantages • Server VI will need to handle complex cases • Server VI will need to be running at all times

  11. Goals for the coming week • Successful interviews with ADTRAN • Research MySQL connectivity alternatives • 802.11x w/ network server solution • Bluetooth/AirCable pass-thru solution • Bluetooth connection independent of PDA, so one PDA can connect to multiple devices • Wrap up mid-semester progress report