'50 gev' diaporamas de présentation

50 gev - PowerPoint PPT Presentation


mini summary of CARE-HHH BEAM’07

mini summary of CARE-HHH BEAM’07

mini summary of CARE-HHH BEAM’07. W. Scandale and F. Zimmermann PAF Meeting 3 December 2007. BEAM’07. CARE-HHH-APD event at CERN, 1-5 October 2007 - mini-workshop on LHC Injectors Upgrade & FAIR PS2, SPS enhancements, GSI upgrades

By paulos
(264 views)

EIC Detector for K/π structure

EIC Detector for K/π structure

EIC Detector for K/π structure. Some initial thoughts: R. Yoshida JLab. Topics (not an outline!). Sullivan process and some kinematics Acceptance e-Pi (e-K) final state leading neutron ( Λ ) Detectors Zero Degree Calorimeter Forward Spectrometer. Kaon and Pion Structure at an EIC.

By lilianna
(95 views)

Status and Plan of J-PARC

Status and Plan of J-PARC

Status and Plan of J-PARC. Shin’ya Sawada KEK (High Energy Accelerator Research Organization, Japan) Quark Matter 2008 Jaipur, India February 7, 2008. Overview Accelerator Complex Construction Status Nuclear and Particle Physics Facility at J-PARC Facility PAC

By armand
(160 views)

Hiroyuki Sako ( ASRC/J-PARC, JAEA ) f or J-PARC HI Collaboration QM2014, Darmstadt

Hiroyuki Sako ( ASRC/J-PARC, JAEA ) f or J-PARC HI Collaboration QM2014, Darmstadt

Towards the Heavy-Ion Program at J-PARC. 1. Introduction 2. H eavy ion acceleration scheme 3. Physics goals 4 . E xperimental design 5. Summary. Hiroyuki Sako ( ASRC/J-PARC, JAEA ) f or J-PARC HI Collaboration QM2014, Darmstadt. Introduction. LHC RHIC. SPS.

By kalista
(121 views)

E 166 “Polarized Positrons for Future Linear Colliders”

E 166 “Polarized Positrons for Future Linear Colliders”

E 166 “Polarized Positrons for Future Linear Colliders”. John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004. Introduction. Overview and purpose of E166 Experimental Setup Status & Milestones. Collaboration.

By willem
(108 views)

PS2 Beams for SPS

PS2 Beams for SPS

PS2 Beams for SPS. Michael Benedikt AB/OP. PS2 main parameters (protons). Injection energy via beam brightness: Reach twice brightness of the ultimate 25 ns LHC beam (20% reserve for losses): 4.0 10 11 per LHC bunch (inst. 1.7 10 11 ) within nominal transverse emittances

By elke
(96 views)

Discovery potential for the MSSM H/A  →μ + μ - decays with the ATLAS detector

Discovery potential for the MSSM H/A  →μ + μ - decays with the ATLAS detector

Discovery potential for the MSSM H/A  →μ + μ - decays with the ATLAS detector … and other even more exotic particles. Univ. of Athens Dimitris Fassouliotis C. Kourkoumelis P. Ioannou K. Nikolopoulos Z. Roupas Inst. of Physics, Belgrade M. Milosavljevi ć. Layout:

By lewis
(97 views)

CERN Beam Test of Silicon-Tungsten Calorimeter Test Module

CERN Beam Test of Silicon-Tungsten Calorimeter Test Module

CERN Beam Test of Silicon-Tungsten Calorimeter Test Module. Shinwoo Nam (Ewha Womans University). Content: Silicon Sensor, Calorimeter Test Module, Beam Test and Data Plots.

By nikki
(155 views)

MAGIC observation of GRB 090102

MAGIC observation of GRB 090102

Table 1:. Upper limits for the emission of GRB090102, corres-ponding to 5910 s of the MAGIC-1 observation from 03:14:52 UT to 04:53:32 UT. The 31st International Cosmics Rays Conference· Łódź, Poland, 7-19 July 2009. MAGIC observation of GRB 090102.

By teva
(111 views)

Participation in T2K neutrino program? benefits, options, and opportunities

Participation in T2K neutrino program? benefits, options, and opportunities

Participation in T2K neutrino program? benefits, options, and opportunities. Achim Geiser ZEUS DESY group discussion on future opportunities 26. January 05. Introduction

By payton
(128 views)

Status of T2K Tokai to Kamioka Neutrino Project at J-PARC

Status of T2K Tokai to Kamioka Neutrino Project at J-PARC

Status of T2K Tokai to Kamioka Neutrino Project at J-PARC June 21, 2004 Koichiro Nishikawa Kyoto University. “T2K” (Tokai-to-Kamioka) neutrino experiment. LOI: hep-ex/0106019. n m beam of < 1GeV. Kamioka. Super-K: 50 kton Water Cherenkov. J-PARC

By varsha
(82 views)

Physics Opportunities with Future Proton Accelerators

Physics Opportunities with Future Proton Accelerators

Physics Opportunities with Future Proton Accelerators. Report to Neutrino IDS John Ellis, March 29th 2007. POFPA study group: Blondel, Camilleri, Ceccucci, JE, Lindroos, Mangano, Rolandi Advisory group to the CERN DG. The High-Energy Frontier @ CERN.

By arawn
(153 views)

N eutrinos options at CERN

N eutrinos options at CERN

N eutrinos options at CERN. R. Garoby – 27/04/2009. OUTLINE. Context: plans for future LHC injectors Potential neutrino options 2.1 “Conventional” n beams: CNGS SPS with the new injectors Low energy n “Super-beam” 2.2 Neutrino Factory 2.3 Beta beams 3. Summary.

By amandla
(134 views)

Detector Sub-Systems: Transition Radiation Detector Time of Flight scintillator counters

Detector Sub-Systems: Transition Radiation Detector Time of Flight scintillator counters

Mass : 7 t Size: ~ 3.2 x 2.7 m Power consumption: 2 kW Acceleration take off: 9 g Operation Temperature: -180 o + 50 o C Outgasing limit : <10 - 12 g/s/cm 2

By gilles
(171 views)

High Momentum Beamline at J-PARC

High Momentum Beamline at J-PARC

High Momentum Beamline at J-PARC. Shin’ya Sawada KEK (High Energy Accelerator Research Organization, Japan). Introduction Examples of Experiments High Mass Dimuon (unpol) High Mass Dimuon (pol): Goto-san Phi: Yokkaichisan … Beamline Overview and R&D. Slow Extraction Beamline (Phase 1).

By kawena
(119 views)

SLHC-PP kick-off meeting , CERN 9 April 2008

SLHC-PP kick-off meeting , CERN 9 April 2008

SLHC Accelerator and Injector Upgrades. Lyn Evans. SLHC-PP kick-off meeting , CERN 9 April 2008. Peak Luminosity. N b number of particles per bunch n b number of bunches f r revolution frequency  n normalised emittance  * beta value at Ip F reduction factor due to crossing angle

By vine
(125 views)

LHC Machine Advisory Committee , CERN 12th June 2008

LHC Machine Advisory Committee , CERN 12th June 2008

Current Status of LHC Project and Upgrade Plan. Lyn Evans. LHC Machine Advisory Committee , CERN 12th June 2008. Summary LHC Cryogenics. Cooldown status. Sector 56. Sector 67. Sector 78. Sector 81. Cooldown status. Sector 12. Sector 23. Sector 34. Sector 45.

By gwyn
(132 views)

Feasibility Study of Pion-induced DY Process in FNAL E906

Feasibility Study of Pion-induced DY Process in FNAL E906

Santa Fe Polarized Drell -Yan Physics Workshop. Feasibility Study of Pion-induced DY Process in FNAL E906. Wen-Chen Chang (Institute of Physics, Academia Sinica) & Jen-Chieh Peng (UIUC) 11/1/2010. Competition and complementarity. DY acceptance @ COMPASS.

By jory
(107 views)

2 - Collider Physics

2 - Collider Physics

2 - Collider Physics. 2.1 Phase space and rapidity - the “plateau” 2.2 Source Functions - protons to partons 2.3 Pointlike scattering of partons 2.4 2-->2 formation kinematics 2.5 2--1 Drell-Yan processes 2.6 2-->2 decay kinematics - “back to back” 2.7 Jet Fragmentation.

By shana
(102 views)

PS2 design status

PS2 design status

LIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th , 2007. Upgrade of the injector chain (R. Garoby, PAF). Proton flux / Beam power. Linac4. Linac2. 50 MeV. 160 MeV. PSB. SPL’ RCPSB. SPL. 1.4 GeV. ~ 5 GeV. PS. SPL: Superconducting Proton Linac ( ~ 5 GeV)

By kevlyn
(129 views)

View 50 gev PowerPoint (PPT) presentations online in SlideServe. SlideServe has a very huge collection of 50 gev PowerPoint presentations. You can view or download 50 gev presentations for your school assignment or business presentation. Browse for the presentations on every topic that you want.