'Alice pid cms atlas' presentation slideshows

Alice pid cms atlas - PowerPoint PPT Presentation


The physics programme of the ALICE experiment at the LHC

The physics programme of the ALICE experiment at the LHC

The physics programme of the ALICE experiment at the LHC. Marco Monteno INFN Torino, Italy. Italo-Hellenic School of Physics 2006 “The physics of LHC”. Martignano (Lecce), 12-19 June 2006. Contents. Nucleus-nucleus collisions (and p-p) at the LHC The ALICE experiment

By lis
(131 views)


View Alice pid cms atlas PowerPoint (PPT) presentations online in SlideServe. SlideServe has a very huge collection of Alice pid cms atlas PowerPoint presentations. You can view or download Alice pid cms atlas presentations for your school assignment or business presentation. Browse for the presentations on every topic that you want.

Related Searches for Alice pid cms atlas
ATLAS and CMS activities

ATLAS and CMS activities

ATLAS and CMS activities. Albert De Roeck CERN. ECFA/DESY meeting St Malo 12-15 April 2002. LHC Prospects. New date for first beams/collisions: 1/4/2007 Initial physics run starts in 2007  ~10 fb -1 (2.10 33 cm -2 s -1 )

By gale (119 views)

IV Workshop Atlas-CMS

IV Workshop Atlas-CMS

IV Workshop Atlas-CMS. Aspettative di ATLAS e CMS per il pilot run 2007 e inizio 2008. “triggers, rates, calibrazioni, validazione detector, possibili misure…”. U.Gasparini, Univ.di Padova & INFN Padova A.Nisati, INFN Roma1. Sommario. scenario di startup per LHC: “pilot run”del

By kyrene (102 views)

Vortrag LHC+ATLAS/CMS

Vortrag LHC+ATLAS/CMS

Vortrag LHC+ATLAS/CMS. 20.07.2006 Im Rahmen der Vorlesung Detektoren in der Elementar-teilchenphysik Gordon Fischer und Michael Volkmann. Überblick. A: Motivation: Higgs Boson und SUSY B: Large Hadron Collider (LHC) C: Experiment 1: ATLAS D: Experiment 2: CMS. HIGGS-Teilchen.

By elizabeth-kirk (222 views)

ATLAS/CMS pixel 65 workshop

ATLAS/CMS pixel 65 workshop

ATLAS/CMS pixel 65 workshop. Why this workshop ?. Isn’t there enough pixel conferences/workshops/meetings/etc. ? Answer: Yes but . . .

By jaegar (75 views)

CMS and ATLAS Materials available

CMS and ATLAS Materials available

CMS and ATLAS Materials available. A.Dudarev, B.Cure. ATLAS Materials:. Conductors: five leftover spools of about 50 -100 m bare one spool of bare conductor of 2667 m bare ECT Al stabilized conductor:   two spools of 1175 m and 1200 m (with repaired joint) Aluminum billets:

By moe (84 views)

Physics with ATLAS and CMS

Physics with ATLAS and CMS

Physics with ATLAS and CMS. The two big multi-purpose experiments at the LHC. Exploring the TeV scale:. Where does mass come from?. Are there new symmetries or extra-dimensions?. What is dark matter?. Can we unify the fundamental interactions?. The Experiments / Proton-Proton Collisions.

By alexia (119 views)

ATLAS, CMS B-Physics Reach

ATLAS, CMS B-Physics Reach

ATLAS, CMS B-Physics Reach. UK HEP FORUM The Cosener's House, Abingdon, 24th-25th April 2004 'From the Tevatron to the LHC'. M.Smizanska, Lancaster University, UK. 100 m b. 230 m b. ATLAS,CMS: b-events from central pp LHC collisions.

By india (94 views)

ATLAS & CMS Online Clouds

ATLAS & CMS Online Clouds

ATLAS & CMS Online Clouds. exploit the Experiments ’ online farms for offline activities during the LS1 & beyond. Olivier Chaze (CERN-PH-CMD) & Alessandro Di Girolamo (CERN IT-SDC-OL). ~ 100 m. The L arge H adron C ollider. The experiment data flow. 40 MHz ( 1000 TB/sec).

By tawana (117 views)

Computing Model ATLAS & CMS

Computing Model ATLAS & CMS

Computing Model ATLAS & CMS. Federica Fanzago (CMS) & Monica Verducci (ATLAS) III Workshop Italiano della Fisica di ATLAS e CMS Bari, 20-22 Ottobre 2005. Sommario. Introduzione ad LHC Descrizione del Computing Model Data Flow Trigger e Streams Work Flow

By ferris (129 views)

SU activities pendant LS1 CMS ALICE

SU activities pendant LS1 CMS ALICE

SU activities pendant LS1 CMS ALICE. CMS Quoi (quelles activités prévues pendant le LS1). At the beginning: Network measurement and cavern floor stability Stability measurement after run period for beam pipe, TAS Measurements during detector opening In between:

By tam (145 views)