'Arduini' diaporamas de présentation

Arduini - PowerPoint PPT Presentation


Thu 06/02

Thu 06/02

Thu 06/02. Fill 3535 ongoing since 05:24

By trapper
(122 views)

Summary of week 40

Summary of week 40

Summary of week 40. Machine Coordinators: G. Arduini , M. Lamont Main aims: L uminosity production, 25 ns test to verify feasibility of scrubbing run after change of MKI8D

By amber
(118 views)

Limits on collimator settings and reach in β * R . Bruce on behalf of the collimation team

Limits on collimator settings and reach in β * R . Bruce on behalf of the collimation team

Limits on collimator settings and reach in β * R . Bruce on behalf of the collimation team Acknowledgement: G. Arduini. Outline. Introduction: Influence of LHC collimation system on machine performance

By maxima
(131 views)

PS2 Electron-Cloud Build-Up Studies: Status LARP CM12, Napa, CA, 9 April 2009

PS2 Electron-Cloud Build-Up Studies: Status LARP CM12, Napa, CA, 9 April 2009

US LHC Accelerator Research Program. bnl - fnal- lbnl - slac. PS2 Electron-Cloud Build-Up Studies: Status LARP CM12, Napa, CA, 9 April 2009. Miguel A. Furman LBNL mafurman@lbl.gov.

By leane
(129 views)

S. Fartoukh 18/05/2009 for G. Arduini Proposal based on strict requirements &

S. Fartoukh 18/05/2009 for G. Arduini Proposal based on strict requirements &

S. Fartoukh 18/05/2009 for G. Arduini Proposal based on strict requirements & experience gained during the 2008 HWC campaign.

By roger
(82 views)


View Arduini PowerPoint (PPT) presentations online in SlideServe. SlideServe has a very huge collection of Arduini PowerPoint presentations. You can view or download Arduini presentations for your school assignment or business presentation. Browse for the presentations on every topic that you want.

Recherches associées pour Arduini
Summary of Week 13 G. Arduini, B. Holzer

Summary of Week 13 G. Arduini, B. Holzer

Summary of Week 13 G. Arduini, B. Holzer Main aim: Recovery from Technical stop and start preparations for high intensity. Sun 3/4 – Mon 4/4. 08:00-15:30: Collimation setting-up at 450 GeV and 3.5 TeV 15:30-17:30 Ramp-down and start injection setting-up with 75 ns beam

By barr (107 views)

Summary of Week 16 G. Arduini, J. Wenninger

Summary of Week 16 G. Arduini, J. Wenninger

Summary of Week 16 G. Arduini, J. Wenninger Main aim: Consolidate operation with 50 ns and trains of 36 and 72 bunches for physics and luminosity production. Availability and performance. Machine available ~75% since last Monday morning: Major stops:

By carla-wong (114 views)

Lezione 11 Corso di “Economia Industriale Internazionale” Davide Arduini

Lezione 11 Corso di “Economia Industriale Internazionale” Davide Arduini

Lezione 11 Corso di “Economia Industriale Internazionale” Davide Arduini. 1. Concetti di base. Abbiamo visto che la concentrazione è legata al potere di mercato Adesso ci interessa analizzare cosa determina la concentrazione

By griffith-smith (148 views)

G. Rumolo, G . Iadarola , H. Bartosik , G. Arduini

G. Rumolo, G . Iadarola , H. Bartosik , G. Arduini

Follow up on electron cloud studies in LHC: Possible strategy for scrubbing LHC for 25 ns operation. G. Rumolo, G . Iadarola , H. Bartosik , G. Arduini. Outline. Recapitulation of the main facts (2011-2012 experience with 25 ns beams) A possible path for LHC start up in 2015

By deacon (120 views)

Switching to 50/75 ns bunch trains G. Arduini

Switching to 50/75 ns bunch trains G. Arduini

Switching to 50/75 ns bunch trains G. Arduini w ith input from R. Assmann, P. Baudrenghien, K. Cornelis, B. Goddard, W. Herr, W. Höfle , G. Rumolo, R. Steerenberg, J. Wenninger. Why?. Early look at potential problems for next year operation:

By rufina (110 views)

Very Preliminary proton MD summary G. Arduini – BE/ABP

Very Preliminary proton MD summary G. Arduini – BE/ABP

Very Preliminary proton MD summary G. Arduini – BE/ABP Acknowledgements: BI, Collective effects team, Cryo , Injection Team, OP, Vacuum Team Special thanks to Massi and Experiments. Motivations.

By vevina (102 views)

Lezione 10 Corso di “Economia Industriale Internazionale” Davide Arduini

Lezione 10 Corso di “Economia Industriale Internazionale” Davide Arduini

Lezione 10 Corso di “Economia Industriale Internazionale” Davide Arduini. 1. Differenziazione del prodotto . Contesto e concetti Una delle ipotesi che portano alla “trappola” di Bertrand è che i prodotti siano omogenei Nella realtà, molti prodotti sono “differenziati” (imperfetti sostituti)

By coye (325 views)

Domenico Arduini Dipartimento di Chirurgia Università di Tor Vergata

Domenico Arduini Dipartimento di Chirurgia Università di Tor Vergata

Fisiopatologia della circolazione fetale. Domenico Arduini Dipartimento di Chirurgia Università di Tor Vergata. U.Org di Medicina Prenatale Osp. Fatebenefratelli Isola Tiberina. Circolazione fetale. Caratteristiche: in parallelo differenze tra LCO e RCO presenza di shunt

By razi (159 views)

Lezione 9 Corso di “Economia Industriale Internazionale” Davide Arduini

Lezione 9 Corso di “Economia Industriale Internazionale” Davide Arduini

Lezione 9 Corso di “Economia Industriale Internazionale” Davide Arduini. 1. Concetti di base. La Discriminazione di Prezzo (DP) si attua praticando prezzi differenti per differenti unità vendute dello stesso bene

By dani (156 views)

50 and 75 ns operation G. Arduini – BE/ABP

50 and 75 ns operation G. Arduini – BE/ABP

50 and 75 ns operation G. Arduini – BE/ABP Contributions from: BI, ABP Collective effects Team, Cryo , Injection Team, OP, RF, Vacuum Team. Outline. Effects on vacuum with 50 and 75 ns beams Scrubbing effect on vacuum Effects on cryogenics with 50 and 75 ns beam

By carmine-baxter (97 views)