'Supply points' diaporamas de présentation

Supply points - PowerPoint PPT Presentation


Measurement of Retail Concentration and Variety in Vertically-used Large-scale Retail Properties

Measurement of Retail Concentration and Variety in Vertically-used Large-scale Retail Properties

European Real Estate Society Annual Conference 2010 (ERES2010) Milan, Italy. Measurement of Retail Concentration and Variety in Vertically-used Large-scale Retail Properties. Dr. Tony Shun-Te Yuo Department of Real Estate and Built Environment National Taipei University, Taiwan. Introduction.

By reese
(273 views)

User Pays User Committee 12 th November 2013

User Pays User Committee 12 th November 2013

User Pays User Committee 12 th November 2013. Two new Non-Code User Services are proposed. These are for: iGT Customer Data Provision Service (to facilitate the Smart metering programme) iGT Customer Data Preparation Service (to facilitate the iGT Single Service Provision arrangements).

By thais
(248 views)

Nexus Workgroup CSEP Transition Topic

Nexus Workgroup CSEP Transition Topic

Nexus Workgroup CSEP Transition Topic. June 2014. Contents. Current numbers Naming conventions Modification 0440 Project Nexus – Single Service Provision iGT Agency Services overview iGT data preparation Transition / cutover matters. CSEPs Numbers. Live Projects – 41,567

By darice
(179 views)

Single Meter Supply Points

Single Meter Supply Points

Single Meter Supply Points. Discussion Points for Workstream 0428 27 September 2012. Population of meter points by SPAQ band. Population of meter points by SPAQ band and grouping size. Form of System Capacity Charge. Interesting points to note. SP < 73,200kWh

By druce
(77 views)

Class One - First Class

Class One - First Class

Class One - First Class. Next Briefing. Operational Rations. Program Update: Rick Byrd, Quality Assurance Division. QUAD. Quality Assurance Division:.

By uttara
(244 views)

Supply Point Capacity BSSOQ and Supply Point ratchets

Supply Point Capacity BSSOQ and Supply Point ratchets

Supply Point Capacity BSSOQ and Supply Point ratchets. Chris Warner. What is the Bottom Stop Supply Point Capacity (BSSOQ)?. UNC TPD G5.2.3

By rossa
(79 views)

Chris Warner – 31 st January 2013

Chris Warner – 31 st January 2013

UNC Modification Proposal 0440 Project Nexus – iGT Single Service Provision Proposed UNC contractual regime. Chris Warner – 31 st January 2013. UNC Modification Proposal 0440 – Proposed regime outline.

By abril
(92 views)

Project Nexus Workgroup

Project Nexus Workgroup

Project Nexus Workgroup. 9 th September 2014. Background. During detailed design a number of areas have been identified that require clarification with either UNC or current processes due to the impacts new requirements have on the processes The areas identified are

By zandra
(291 views)

UNC Modification Proposal 0202 National Grid Distribution

UNC Modification Proposal 0202 National Grid Distribution

UNC Modification Proposal 0202 National Grid Distribution. “Improvement to More Frequent Readings Provisions to allow benefits of AMR” Distribution Workstream – 28 February 2008 Chris Warner. Introduction. Current Frequency Proposal and Read Volume Implications Benefits

By vincent-bernard
(92 views)

Success story

Success story

Success story. By SK SUDHANTHIRAN Manager(CS)/Bangalore DO. Non-Implementation of RTGS circular by supply points (Interstate) –Back ground. Bangalore DO has around 70 customers drawing supplies on interstate basis from TNSO (4100)locations Products- FO/LDO/SKO/HSD(EOU & SEZ)

By louis-robbins
(133 views)

Impacts of Mod 244

Impacts of Mod 244

Impacts of Mod 244. Steve Nunnington xoserve. Background. 96.5% of transportation charges based on capacity. These are dependent on historical throughput. Capacity charges on DM sites are based on:- Bottom Stop SOQ. (BSSOQ) applicable to certain Interruptible sites. DM SOQ.

By irma-cooley
(67 views)

User Pays User Committee 12 th November 2013

User Pays User Committee 12 th November 2013

User Pays User Committee 12 th November 2013. Two new Non-Code User Services are proposed. These are for: iGT Customer Data Provision Service (to facilitate the Smart metering programme) iGT Customer Data Preparation Service (to facilitate the iGT Single Service Provision arrangements).

By miranda-ballard
(207 views)

Project Nexus Workgroup

Project Nexus Workgroup

Project Nexus Workgroup. 9 th September 2014. Background. During detailed design a number of areas have been identified that require clarification with either UNC or current processes due to the impacts new requirements have on the processes The areas identified are

By asturgill
(3 views)

Chris Warner – 31 st  January 2013

Chris Warner – 31 st January 2013

UNC Modification Proposal 0440 Project Nexus – iGT Single Service Provision Proposed UNC contractual regime. Chris Warner – 31 st January 2013. UNC Modification Proposal 0440 – Proposed regime outline.

By novakr
(0 views)

User Pays User Committee 12 th  November 2013

User Pays User Committee 12 th November 2013

User Pays User Committee 12 th November 2013. Two new Non-Code User Services are proposed. These are for: iGT Customer Data Provision Service (to facilitate the Smart metering programme) iGT Customer Data Preparation Service (to facilitate the iGT Single Service Provision arrangements).

By csoler
(1 views)

Single Meter Supply Points

Single Meter Supply Points

Single Meter Supply Points. Discussion Points for Workstream 0428 27 September 2012. Population of meter points by SPAQ band. Population of meter points by SPAQ band and grouping size. Form of System Capacity Charge. Interesting points to note. SP < 73,200kWh

By herringj
(1 views)


View Supply points PowerPoint (PPT) presentations online in SlideServe. SlideServe has a very huge collection of Supply points PowerPoint presentations. You can view or download Supply points presentations for your school assignment or business presentation. Browse for the presentations on every topic that you want.