1 / 21

Process Hazard Analysis Revalidations

Learn about the requirements and purpose of process hazard analysis revalidations, including how to decide whether to redo or read through the analysis. Discover the steps for preparing, selecting the methodology, and assembling the team for performing the analysis.

selby
Télécharger la présentation

Process Hazard Analysis Revalidations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Process Hazard Analysis Revalidations If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at: Service@scsengineers.com

  2. Process Hazard Analysis RevalidationsRequirements & Purpose What are the requirements? • Revalidate and update the Process Hazard Analysis at least every five years after its initial or previous completion. • Revalidation to be performed by a qualified team. What’s the purpose? • Comply with the OSHA PSM [29 CFR 1910.119(e)(6)] and EPA RMP [40 CFR 68.67(f)] regulations. • Ensure that the PHA is consistent with the current process.

  3. Process Hazard Analysis RevalidationsPhilosophy – To Re-do or Read Through? How should I decide? • Thoroughness of the initial or previous PHA • Did we re-do or read through five years ago? • Who was present in the previous PHA? • Changes to the process in the last five years – significant or minor?

  4. Process Hazard Analysis RevalidationsPhilosophy – To Re-do or Read Through? • OSHA Letter of Interpretation (June 28, 2998): • “Employers must establish the scope and extent of their PHA updates and revalidations to include at least the following: evaluations of existing PHAs for accuracy and completeness using the criteria set forth in 1910.119(e)(3); • checks to ensure that modifications to processes since the last PHAs have gone through management of change procedures or PHAs when required and that those changes are reflected in the PHAs; • an evaluation of process safety information (PSI) to ensure that it is complete, current and accurate; • verifications to ensure PHA specified procedures are adequate, up-to-date and are being implemented; • determinations that existing PHA recommendations have been documented in their required respective areas such as PSI, PHAs, and procedures (operating, mechanical integrity, emergency response, etc.) and have been implemented; • a review of all incident investigation reports required by 1910.119(m) to assure all affected PSI, procedures, training, etc., have been updated to reflect recommendations set forth in the subject reports and that appropriate information from those reports have been incorporated into the PHAs. • Finally, OSHA intends that the PHA update and revalidation be documented.” OSHA

  5. Process Hazard Analysis RevalidationsPreparing for the PHA - Summary • Review implementation status of previous PHA recommendations. • Verify accuracy of PSI: • Piping diagrams • Normal operating conditions • Safety systems • List any changes to the process in the last five years (i.e., MOC review). • Review five year accident history / incident investigation records. • Ensure SOPs are current.

  6. Process Hazard Analysis RevalidationsPreparing for the PHA – RAGAGEP • Define recognized and generally accepted good engineering practices (RAGAGEPs) used to design, operate, and maintain your process. • Mechanical, Fire, and Building Codes • Standards – ANSI/ASHRAE 15, ANSI/IIAR 2 • Guidelines – IIAR Bulletins • Manufacturer’s Recommendations

  7. Process Hazard Analysis RevalidationsPreparing for the PHA – RAGAGEP • IIAR Bulletin 109 – Safety System Inspections • IIAR Bulletin 110 – Maintenance Schedules • IIAR Bulletin 111 – Ventilation Design and Maintenance • IIAR Bulletin 114 – Labeling • ANSI / ASHRAE Standard 15 – Ammonia Relief Discharge Locations • ANSI/IIAR 2 – Ammonia Sensor Settings and Actions • ANSI/IIAR 2 – E Stop Locations • EPA Ammonia Refrigeration System Alert Bulletin

  8. Process Hazard Analysis RevalidationsPreparing for the PHA – Selecting the PHA Methodology • The PHA methodology must be “appropriate to determine and evaluate the hazards of the process being analyzed.” [40 CFR 68.67(b) & 29 CFR 1910.119(e)(2)] • What If Analysis • Develop “what if” questions around equipment failures, process upsets, and human factor issues. • Hazard and Operability Study (HAZOP) • Use of Guidewords to identify deviations from the design intention. • Checklists

  9. Process Hazard Analysis RevalidationsPreparing for the PHA –Who’s on your team? • “The PHA shall be performed by a team with expertise in engineering and process operations, with at least one employee who has experience and knowledge specific to the process being analyzed. Also, one member of the team must be knowledgeable in the specific PHA methodology being used.” [40 CFR 68.67(d) & 29 CFR 1910.119(e)(4)] • Design Engineers • Operations and Maintenance Personnel • Refrigeration Contractor • Safety / Environmental Management • PHA Leader & Recorder • Regulatory Representative

  10. Process Hazard Analysis RevalidationsPerforming the PHA • Identify hazards associated with the process using selected methodology. • Determine causes and consequences of each potential hazard. • Discuss any incidents that have occurred at your facility in relation to each potential hazard. • Identify the administrative and engineering safeguards associated with each potential hazard. • Determine risk ranking for each hazard discussed. • Postulate mitigation measures to reduce the consequences and/or likelihood of each potential hazard.

  11. Process Hazard Analysis RevalidationsPerforming the PHA HAZOP Guide Words • Composition Change • Contamination • Relief • Instrumentation • Sampling • Corrosion/Erosion/Materials of Construction • Service Failure • Abnormal Operation • Maintenance • Ignition • Spare Equipment • Safety • No Flow • Reverse Flow • More Flow • Less Flow • More Level • Less Level • More Pressure • Less Pressure • More Temperature • Less Temperature • More Viscosity • Less Viscosity • Agitation

  12. Process Hazard Analysis RevalidationsPerforming the PHA Risk Ranking Qualitative Definitions of Probability of Occurrence of an Accident (Frequency Ranking) A Frequent 0 to 1 years More than once per year B Periodical Every 1 to 10 years At Least once each decade C Occasional Every 10 to 100 years Probably during the life of the plant D Possible Every 100 to 10,000 years Not expected at this plant, but could occur E Improbable Not for 10,000 or more years Not expected or likely to occur at all

  13. Process Hazard Analysis RevalidationsPerforming the PHA Risk Ranking Qualitative Definitions of Severity of Consequences to People During an Accident (Criticality Ranking) I Catastrophic Results in death (or damage and production losses > $1,000,000) II Severe Results in multiple injuries (or losses between $100,000 and $1,000,000) III Moderate Results in a single injury (or losses between $10,000 and $100,000) IV Slight Results in operational problems only (or losses <$10,000)

  14. Process Hazard Analysis RevalidationsPerforming the PHA RISK MATRIX RISK CODE 1 - Critical 2 - Undesirable 3 - Acceptable with controls 4 - Acceptable

  15. Process Hazard Analysis RevalidationsPerforming the PHA RISK MATRIX Risk Code: 1: Critical Must be improved Mitigate within six months with administrative or engineering controls (to reduce the risk code to 3 or more) 2: Undesirable Should be improved Mitigate within one year with administrative or engineering controls (to reduce the risk code to 3 or more) 3: Acceptable With Controls Verify need for engineering controls, or that administrative controls are in place for hazard 4: Acceptable No mitigating action required for identified hazard

  16. Process Hazard Analysis RevalidationsPerforming the PHA

  17. Process Hazard Analysis RevalidationsPerforming the PHA

  18. Process Hazard Analysis RevalidationsPerforming the PHA • Ensure the previous PHA adequately satisfied the requirements of a PHA: • Previous incidents • Safeguards and the consequences of the safeguard failing. • Engineering and administrative control relationships. • Facility Siting • Engine Room exhaust vs. Ventilation Intake • Roof Hazards • Access to Eyewash / Safety Showers • Human Factors • Qualitative Assessment of Frequency and Consequences

  19. Process Hazard Analysis RevalidationsRecommendation Tracking • Develop a written schedule for completing action items. • Assign responsibilities. • Meet periodically to review status of recommendations and ensure progress is being made. • Document recommendation review meetings and actions taken to implement recommendations. • Maintain evidence that shows progress or completion of action items. • Review status/outcomes with operating, maintenance, and any other persons who are affected by the recommendations.

  20. Process Hazard Analysis RevalidationsDocumentation • All Process Hazard Analysis Study reports must be maintained for the life of the process. • Including recommendation resolution. • Sign In Sheets. • Piping Diagrams from the date of the study. • Team Leader Qualifications. • Methodology. • Regulatory Invites as applicable.

  21. Process Hazard Analysis RevalidationsWhat Can Be Learned… • Safety improvements. • Operability improvements. • Operator “wish list”. • Engineering and administrative controls in place for handling releases or potential releases. • Clarify emergency response / action procedures. • Operator training program. • Alternative Release Scenarios.

More Related