BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

R. P. Gallagher Associates Structural Engineers. BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007. PORTABLE. MAIN BUILDING. N. KEY PLAN :. C. B. D. A. E. 1930’s BUILDING. SITE PLAN. MAIN BUILDING. OPTIONS CONSIDERED: REPAIR / REPLACE PORTABLE

selia
Télécharger la présentation

BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. R. P. Gallagher Associates Structural Engineers BEACH ELEMENTARY SCHOOL CONCEPT DESIGN October 24, 2007

  2. PORTABLE MAIN BUILDING

  3. N KEY PLAN : C B D A E 1930’s BUILDING SITE PLAN

  4. MAIN BUILDING OPTIONS CONSIDERED: • REPAIR / REPLACE PORTABLE • INTERIOR / EXTERIOR STRENGTHENING • LIFT / EXTERIOR RAMP VS. ELEVATOR

  5. PORTABLE

  6. UPGRADE CRITERIA • ORIGINAL 1930’S BUILDING TO BE STRENGTHENED • ASCE 41 • LIFE SAFETY PERFORMANCE LEVEL

  7. OVERVIEW OF STRENGTHENING OPTIONS RECOMMEND: • ADD PLYWOOD SHEATHING TO INTERIOR SIDE OF EXTERIOR WALLS • STRENGTHEN MANY INTERIOR WALLS • ADD PLYWOOD TO AUDITORIUM ROOF • ADD HARDWARE, INCLUDING HOLD-DOWNS

  8. LEGEND: (N) WALL (N) STEEL STRAPS AT WINDOWS KEY PLAN : N (N) SHEAR WALL AT INTERIOR (N) STEEL STRAPS AT TOP OF WALL AUDITORIUM

  9. KEY PLAN : N ADMINISTRATION

  10. KEY PLAN : N CLASSROOMS (1936)

  11. KEY PLAN : N CLASSROOMS (1939)

  12. N ACCESSIBILITY / LIFE SAFETY CORRECTIVE MEASURES: • NEW ACCESSIBLE PARKING • NEW RAMP AT LAKE AVE • REPLACE DAMAGED RETAINING WALLS • ADA UPGRADES AT EXTERIOR STAIRS AND HANDRAILS • REPLACE PORTABLE BUILDING SITE PLAN KEY PLAN :

  13. LEGEND: FIRE-RATED CORRIDOR STRUCTURAL IMPROVEMENT (N) WALL (N) RATED WALL (N) ARCHITECTURAL IMPROVEMENT FIRE-RATED CORRIDOR CORRECTIVE MEASURES: • FIRE-RATED CORRIDOR • UPGRADES AT DOORS, STAIRS AND LANDINGS • UPGRADES AT KITCHEN AND TOILET ROOMS • REPLACE NON-COMPLIANT • CLASSROOM SINKS • AUTOMATIC FIRE SPRINKLERS THROUGHOUT • UPGRADE FIRE ALARM AUDITORIUM/ ADMINISTRATION/ CLASSROOMS/ CLASSROOMS ADDITION

  14. CORRECTIVE MEASURES: • NEW ELEVATOR FOR STAGE AND ART ROOM ACCESS • UPGRADES AT DOORS, STAIRS, AND LANDINGS • FIRE-RATED CORRIDOR LEGEND: FIRE-RATED CORRIDOR STRUCTURAL IMPROVEMENT (N) WALL (N) RATED WALL (N) ARCHITECTURAL IMPROVEMENT FIRE-RATED CORRIDOR KEY PLAN : N AUDITORIUM

  15. GFA $/SF $ ,000 Building 32,133 163 5,227 New Portable 960 179 172 Sitework 91,482 12 1,107 TOTAL CONSTRUCTION AND SITEWORK WITHOUT PHASING 6,506 Phasing, allow 5.00% 325 TOTAL CONSTRUCTION COST WITH PHASING 6,831 CONSTRUCTION COST ESTIMATE SUMMARY

  16. PROJECT COST SUMMARY PHASED CONSTRUCTION(18 -24 month construction, 3 phase project) In $,000 * CONSTRUCTION COST ESTIMATE: $ 6,800 SOFT COSTS: $ 1,800(AE, PM, & CM Fees, Inspection, Agency, etc.) CONTINGENCIES: Construction: $ 700 Project: $ 300 SUBTOTAL: $ 9,600 ESCALATION: (assume 2009 start) $ 2,000 INTERIM HOUSING PROJECT: $ 600 TOTAL PROJECT CONCEPTUAL COST ESTIMATE $ 12,900 *rounded to nearest $ 100,000

  17. R. P. Gallagher Associates Structural Engineers BEACH ELEMENTARY SCHOOL PRISCILLA MECKLEY-ARCHULETA MIKE WASSERMANN JOHN NELSON RON GALLAGHER* For more information, visit http://www.pusdbond.org