sema
Uploaded by
12 SLIDES
274 VUES
120LIKES

Better Than a Bubble Stick

DESCRIPTION

Better Than a Bubble Stick. Alex Bork, Justinas Lialys, Laurynas Lialys, Tony Srimongkolkul. Purpose in Life. To make things easier for everyone ^(^.^)^ Assist in leveling Apex stages in any environment Expedite leveling the stage. Description of the System . Accelerometer Sensor Node.

1 / 12

Télécharger la présentation

Better Than a Bubble Stick

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Better Than a Bubble Stick Alex Bork, Justinas Lialys, Laurynas Lialys, Tony Srimongkolkul

  2. Purpose in Life • To make things easier for everyone ^(^.^)^ • Assist in leveling Apex stages in any environment • Expedite leveling the stage

  3. Description of the System

  4. Accelerometer Sensor Node

  5. Master Node

  6. Display Node

  7. Technical Specifications

  8. Evaluation and Testing • Slave ATmega • Ensure that the values from the accelerometer are accurate and quantized appropriately • Master ATmega • Observe if it can handle multiple tasks • Display ATmega • Displays characters that are appropriately associated with the slave ATmega

  9. Water leakage in system • Seal the system with enclosure • Vibration Tolerance • Screw and tighten ATmega down to handle short abrupt vibrations • Voltage Drop Across Ethernet Cable • Increase supply voltage • Power Supply • Change battery configuration for appropriate voltage and lifetime • Temperature Handling • Enclosure acting like heat sink

  10. Work Breakdown Structure

  11. Work Schedule

  12. Questions

More Related