1 / 21

Summary of offline Detectors review

Summary of offline Detectors review. Summary Table. ACORDE. Implement full survey misalignment Step size not important because no energy loss is measured Simulation  to be checked Raw data ok till next electronics changes

Télécharger la présentation

Summary of offline Detectors review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of offline Detectors review

  2. Summary Table

  3. ACORDE • Implement full survey misalignment • Step size not important because no energy loss is measured • Simulation  to be checked • Raw data ok till next electronics changes • OCDB parameters now missing, but are needed (e.g. different gain factors in scintillators) • Reco Param to be implemented • Offline calibration – not needed • Trigger: need to store the info, to simulate CTP input, to be done • Time scale to complete everything: required by June 09 • Main problem for the detector: low efficiency (hardware problem) • QA: not done so far

  4. CTP • Naming convention defined but still not in use in AliRoot; new meeting planned to discuss this • Configuration file correctly sent to DAQ logbook and retrieved by the GRP preprocessor • CTP inputs to be propagated to ESD/AOD? • Handling of the errors when writing xcounters file to be done • Xcounters needed for analysis? If yes, they should be treated properly • L2A counters information to DAQ logbook • Interaction record size to be carefully evaluated and limited, according to usefulness • Time between interaction and L0 could be provided with a precision of some bunch crossings (critical for TPC, for example) • Beam structure info from LHC still missing • Trigger preprocessor: task assignment to be defined

  5. EMCAL • Geometry not 100% ready because detector not yet installed • Material budget not an issue because no detector on top of them • Time in digits is simulated in an optimistic way • Event merging done with sdigits that don’t reproduce the shape of the signal  pile-up could cause overflow (???) • Track ref to be done • Embedding: Raw2Sdigits method to be implemented • Discrepancy between simulated data and real data (from test beam) not understood • Raw Data ok, not sure if L1trigger is there. To be modified when changes in the RCU will be implemented • Reco Params to be finalized • Reconstruction still needs some work also for PID • Calibration tasks not completed since no detector in place • Some notions about the trigger, but nothing done so far • QA for hits and ESDs, but much still to do

  6. FMD • Geometry not finalized at all – physical issues involved to be resolved, related to ITS as well • Material Budget issue not investigated. Thought to be ok, anyway, but needs to be checked • Memory consumption not tested • Pileup could be tested • Event merging and embedding never taken into account • Raw data must be switched to the next ALTRO version • Second order offline calibration well underway • Nothing to be stored as far as the trigger is concerned • QA to be clarified

  7. HMPID • Time of the hits to be stored both in hits and digits • Memory & CPU & time consumption not completely under control – the use of Minuit makes it delicate • Event merging and embedding ok • CsI QE map to be added to the OCDB • Reco Params to be implemented • QA: event species to be specified, reference data from real data to be produced

  8. ITS • Some detailed description for the geometry still needed • Still some overlaps in case of misalignment • Step propagation to be changed (too small) according to changes in the track propagation code (curved tracks will be handled properly) • Time taken into account in the hits but not in the digits • Memory and CPU consumption almost under control • Event merging not tested • Event embedding tested some time ago by Andreas Morsch  so merging should be ok • Raw data size could be reduced • GRP to be considered • No new objects foreseen for the OCDB, only one open issue for the RespSDD object about the Time0 • Reco Params implemented but to be checked • V0 still missing smth  task to be given to V0 experts • PID performance to be studied

  9. ITS – II • One SPD DA to be finalized • New DA for SDD • Problems with the memory for the online SDD QA • Checks to be added for Rec and Sim for SDD QA • Simulation of SPD trigger to be started, but main lines defined

  10. MUON • Time in hits/digits to be fixed • MC labels to be propagated to reconstructed objects, but there for the rest • Embedding tested but not merging • OCDB gain data there, but not used • Reco Params: only one type at present stored • GRP under consideration • GMS DA still under test • Alignment procedures to be finalized • New object needed for offline calibration HV+Current of the MTR • QA: event species to be defined, not working properly

  11. PHOS • Geometry to be changed in simulation • Material budget in front of PHOS to be evaluated • Idealistic pulse shape simulated in the raw data • Track references to be implemented • Event merging and embedding seem to work fine • Raw data not finalized – new RCU to be updated; TRU information to be added • Decalibration needs to be put back • Reco Parameters to be implemented • Not all the DAs ready (only 2 out of 4 completed) • No DPs • Offline calibration strategy to be defined – needs to run on ESDs or AODs as a Task • Trigger procedures have to be defined; in simulation the configuration parameters have to be added

  12. PMD • Changes in the geometry (detector only ½ installed) • Survey to be redone • Time to be added in hits/sdigits/digits/reco info • Track ref to be implemented • Event merging ok, not embedding • Reco Params missing • New calib objects needed (hot channels + n. of events) • QA to be done

  13. T0 • Track Ref to be stored • Event merging and embedding not considered • Raw Data format likely to change • Reco Params not needed, so not there • Maybe some new DPs • Trigger simulation needs to be done, no configuration parameters now set; should work with raw data • QA to be done

  14. TOF • Event merging / embedding to be checked (*) • Time window value in simulation to be checked (*) • New parameter for Reco Param objects • Maybe new calib object for HV to be used in reco (now stored in Reference data) • Trigger parameters to be defined and implemented • QA reference histo to be provided for a more detailed check (by module?)

  15. TPC • Small corrections in simulation of the geometry • Full misalignment to be checked • Missing LHC clock phase in simulation • Trigger time offset needed • Some track references to be added • Merging and embedding discussed only for the first time, still unclear • ALTRO trailer missing in Raw Data, and some configuration parameters to be added • RCU data format is going to be changed • New data member to be added in OCDB object • Reco Param obj to be checked and maybe updated

  16. TPC – II • Shift in pT not yet investigated • PID studies to be finalized (dependence on tg(φ), tg(θ), PID at high pT, efficiency at relativistic rise) • Memory consumption to be checked • QA: event species to be implemented, no ref data. Output to be taken out of OCDB • Meeting about calibration issues foreseen

  17. TRD • Geometry to be slightly improved for services and supports • Total weight to be kept under control • Full/survey misaligment is still under study • Time correctly handled in simulation • Embedding not checked (*) • Legacy code in Raw Data to be cleaned up • Raw data volume to be checked • Trigger procedures outlined but to be implemented • Trigger simulation to be finalized, but in very good shape • QA reference data still missing

  18. V0 • Track references to be added • Event merging and embedding to be checked • New calibration object to be implemented for PbPb runs • Use of Reco Params to be implemented, different sets for different run types needed – only default implemented so far • Basic ideas for trigger defined, but procedures to be implemented • QA: no sophisticated check implemented so far, to be added considering the event types as well, as soon as reference data will be ready

  19. ZDC • Beam pipe description missing • Time info to be added  already done? • Some information still missing in the raw data, but to be fixed soon • L0 trigger in raw data not possible, L1 not there, but can be easily added • Gains not directly used, but energy calibration factors used instead • Some DAs still not used at P2 • Offline calibration to be implemented – main design outlined already • Trigger procedures to be implemented, but already oulined • Trigger to be properly simulated • QA: event species not implemented

  20. Common Issues • Event merging + Event embedding • LHC parameters to be stored in GRP • Trigger • QA

  21. Time Info Handling • ACORDE: not known • EMCAL: time simulated in digits in an optimistic way (optimistic detector time resolution) • FMD: ready • HMPID: not ready • ITS: not ready for digits, only in hits • MUON: not ready • PHOS: time is there in hits and digits, but pulse shape not realistic in raw data • PMD: not ready • T0: time there, Alla hopes it is correct  • TOF: ready • TPC: ready • TRD: ready • V0: ready • ZDC: not ready (but maybe now yes)

More Related