An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proton source shutdown schedule Mary Convery 12/14/11

  2. General shutdown info • Still not known whether shutdown starts in March or May (or ?) • Duration driven by ANU work in MI – at least 9 months

  3. Shutdown scheduling (Linac) • NTF can only be off for ~2 months • When RFQ is ready (currently on track for May) • If shutdown starts in May, will disassemble I- while still running • All RFQ and Linac tunnel work will take place while NTF off • 2 mech support vacuum crews (split Ben’s crew) • Biggest Linac job is momentum dump sleeve • Mech support work in Booster will be limited during that time (try to keep BRF cavity refurbishment going) • Linac gallery work will continue on NTF off days • Figured ~6 months of Linac gallery work (most while NTF on)

  4. Shutdown scheduling (Booster) • Then ~6 weeks for Booster girder moves for aperture (run beam between moves) • Will be chances for continuing Booster RF and some Linac work during this time • Then ~6 weeks for commissioning • Penciled in RF cavity swaps for tuner refurbishment roughly every 25 days • Only real difficulty scheduling will be during RFQ installation • Solid state work can take place basically at its own pace • Still understanding scope of LCW work • Test stand for cavities may be affected by MI LCW work

  5. Shutdown schedule • Available from proton source homepage under schedules or • http://www-ad.fnal.gov/proton/protonsched/shutdown2012.html