1 / 14

AT Measurement Systems

AT Measurement Systems. AB-CO Viewpoint. NOELL W ü rzburg. SM18. Colour code. To be maintained until LHC completion To be transformed after LHC completion New projects for LHC operation support To be maintained beyond LHC completion. The four categories.

sharynw
Télécharger la présentation

AT Measurement Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AT Measurement Systems AB-CO Viewpoint NOELL Würzburg SM18 AB/CO Review, Adriaan Rijllart

  2. Colour code • To be maintained until LHC completion • To be transformed after LHC completion • New projects for LHC operation support • To be maintained beyond LHC completion AB/CO Review, Adriaan Rijllart

  3. The four categories • To be maintained until completion: • Measurement benches in industry (50 in total) • To be maintained until completion and then transformed: • SM18, Block 4 (and B181) • New projects • FIDEL - Field Description for the LHC (DB) • FAME - Fast Measurement Equipment (LV-RT) • To be maintained beyond LHC completion • Cable, strands and Cryolab test systems AB/CO Review, Adriaan Rijllart

  4. LabVIEW Systems • Systems in industry • Magnetic measurements (Dipoles, Quads, Correctors) • Geometric measurements (Bores, End caps, Feet) • Electrical tests (Quench, Quench heaters, Isolation) • But I’m quite sure that some of these systems will be reused for the Magnet Rescue Factory. AB/CO Review, Adriaan Rijllart

  5. LabVIEW Systems in industry QIMM8 CIMM5 CIMM10 CIQR1 CIQR2 CIQR3 CIQR4 50 systems in operation DGM1 DIMM2 TESLA NOELL Zeitz ACCEL JEUMONT QIMMSaclay1 QIMMSaclay2 QIMM7 EDMA3 EDMA4 NOELL Würzburg DIMM3 QIMM7 DGM4 DGM5 DIQH5 EDMA5 EDMA6 ALSTOM DIMM1 DIMM5 QIMM4 DGM3 DGM7 DGM10 DIQH3 EDMA1 EDMA2 DIMM4 DIMM6 QIMM5 CIMM9 CIMM11 DGM2 DGM6 CIQR7 DIQH1 DIQH4 EDMA7 EDMA8 ANTEC ANSALDO CIMM2 CIMM8 CIQR5 CIQR6 CIMM4 CIMM6 CIMM11 DGM 8 and 9 travel in between firms CAT, India AB/CO Review, Adriaan Rijllart

  6. LabVIEW Systems in industry TESLA correctors ANSALDO dipoles AB/CO Review, Adriaan Rijllart

  7. LabVIEW Systems in industry Noell, Zeitz (dipole cold-masses) ACCEL, Troisdorf (quadrupoles) AB/CO Review, Adriaan Rijllart

  8. LabVIEW Systems at CERN • SM18 Magnet Test Bench applications (-> Magnet Rescue Factory) • Test Master + Hardware Recognition: Applications to automate sequence from all systems • HFDAQ, LFDAQ, AQA, HVT, MMP, LOSS, MRM New systems: FAME (implemented in PXI - LabVIEW-RT) • On-line Hall plate DAQ 0.5 man*years • On-line Rotating Coil DAQ 1.5 man*years • On-line Fixed Coil DAQ ? To be maintained beyond LHC completion • Warm magnet test bench, Calibration bench, File Server MTBNFS1 • SC Cable Test Station • SC Strand Test Station • Central Cryolab test systems AB/CO Review, Adriaan Rijllart

  9. LabVIEW Systems at CERN High Temperature Superconductor test Corrector Magnetic Measurements High Voltage Isolation test Quench recording AB/CO Review, Adriaan Rijllart

  10. LabVIEW Systems at CERN Superconducting Strands test B163 Special magnetic and optical measurements SM18 Corrector cold tests Block 4 Magnetic Measurements SM18 AB/CO Review, Adriaan Rijllart

  11. LabVIEW Systems at CERN SM18: Magnet Test Control Room B163- FRESCA: superconducting cable reception test AB/CO Review, Adriaan Rijllart

  12. Supervision and PLC Systems (Philippe + Hervé) • Upgrade from PCVue to PVSS using UNICOS on PLCs • SM18: Refrigerator and cryo for the benches (PLC S7) • Block4: Cryo for the benches + PLCs (S5 to S7) To be maintained beyond LHC completion • Manufacturing tools based on PLC for winding, collaring, and welding. Now at magnet industries, these tools need to be installed and maintained at CERN. AB/CO Review, Adriaan Rijllart

  13. Databases (Ronny and Maciej) • SM18 + Block4 upgrade to Oracle 10 (? not desirable) • Magnetic Measurement Data • Reference tables • HW Recognition: maintain + develop MS-DS SSS (ongoing) • Magnet Rescue Factory and FIDEL • HW Recognition: adaptation to low test rate, less complex • Field description for LHC, 1 month cycle, measure analyse include in FIDEL (request of ABP) • Later cycle time much faster (request of ABP) AB/CO Review, Adriaan Rijllart

  14. Conclusion • Systems deployed in industry will return • Some will be reused for the Magnet Rescue Factory • Magnet Rescue Factory + SM18, Block 4 • LabVIEW, PCVue+PLC and Database upgrade • FAME and FIDEL • LabVIEW-RT and Database • Many presently running systems are to be maintained • LabVIEW Cables, Strands, Cryolab, Warm measurements and Calibration systems • PLC manufacturing tools systems • Magnetic Measurement DB AB/CO Review, Adriaan Rijllart