Linac/BC1 Readiness for December 2006 Commissioning P. Emma LCLS Week October 26, 2005

This document provides an overview of the readiness of the LCLS Linac/BC1 for the December 2006 commissioning. It discusses beam diagnostics, beam energy, RF components, magnet power supplies, and high-level applications required for successful commissioning.

sheryla
Télécharger la présentation

Linac/BC1 Readiness for December 2006 Commissioning P. Emma LCLS Week October 26, 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCLS Linac/BC1 Readiness for December 2006 Commissioning P. Emma LCLS WeekOctober 26, 2005

  2. TCAV0 e e Jan. through July ’07 Commissioning through BC1 in 2007 Full set of beam diagnostics at each tune-up point 250 MeV 4.3 GeV 13.6 GeV 6 MeV 135 MeV rf gun L0 BC2 BC1 L1 L2 L3 X …linac undulator SLAC linac tunnel research yard

  3. Linac-0 to Linac-1 no laser-heater sE gex,y and slice RF deflector E

  4. Linac-1 to BC1 CSR relative bunch length monitor? BC1 sE stopper X-band RF gex,y E slice gey

  5. No BC2 in 2007, but possibly TCAV3? Need off-axis screen in 25-9 and BXKIK in 25-2d (or leave TCAV in sec-29) RF deflector

  6. Magnet Power Supply Plans in Place P. Bellomo

  7. High-Level Applications Needed • Bunch length measurement with transverse RF deflector(s) • Emittance meas. (multi-wire, multi-OTR, quad-scan, slice) • background subtraction • rms from profile data (Gauss-fit, rms-calc, baseline-cuts, etc) • Power-steering through beamlines, with corrector weights • Difference orbit fitting, including internal kick

  8. sy Bunch Length Measurement using Trans-Cavity APPLICATION Klystron “on/off” control phase shifter control y-position feedback loop kicker “on/off” control data analysis and plotting image digitizer KLYSTRON GALLERY RF TUNNEL e- S-band y-BPM pulsed x-kicker (sec-25 only?) sz transverse RF deflector (LI21 or LI25) on or off-axis screen

  9. Sector-25 Transverse RF Deflector Results sy= 0.60 mm sy= 0.10 mm sz= 0.205  0.040 mm N = 6.2E9 ppb calib. coef. = 1.032 mm/deg etc… etc… etc… sy= 0.80 mm March 23, 2005 Possible Graphical Output

  10. Dispersion Correction & Trajectory Fitting

  11. Magnet Polarities/Labeling Defined MMF will measure magnets and clearly label polarities

  12. Linac Commissioning Plans

  13. feedback on DIpk/Ipk0 (%) Longitudinal Feedback (use CSR P/P) feedback off J. Wu at undulator entrance

  14. CSR as Relative Bunch Length Monitor J. Wu CSR detector is critical to LCLS stability

  15. Summary • Magnets and power supplies in good shape • Diagnostics (wires, OTR’s, BPMs) questionable • CSR bunch length monitor questionable • High-level applications just starting development • Feedback software unknown • MPS/BCS/PPS needs work Electron beam commissioning through BC1 starts Dec. ’06 !