1 / 11

NECD Implementing provisions now and in the future

NECD Implementing provisions now and in the future TFEIP & EIONET, 31 October - 2 November 2006, Thessaloniki Eduard Dame DG ENV,Unit C5. Existing implementing provisions. Yearly reporting of emissions + projection to 2010 National programmes in 2002 and 2006.

shier
Télécharger la présentation

NECD Implementing provisions now and in the future

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NECD Implementing provisions now and in the future TFEIP & EIONET, 31 October - 2 November 2006, Thessaloniki Eduard Dame DG ENV,Unit C5

  2. Existing implementing provisions • Yearly reporting of emissions + projection to 2010 • National programmes in 2002 and 2006

  3. Existing implementing provisions • Yearly reporting of emissions + projection to 2010 • National programmes in 2002 and 2006 • No exceedance of national emission ceilings in 2010 and later years

  4. Possible non-compliance 2010 Underlined countries will have in 2020 a projected emission still higher than the national emisson ceiling for 2010

  5. Possible non-compliance 2010

  6. Possible non-compliance 2010

  7. Emission inventories and projections • EU Member States have to use the methodologies agreed upon by the CLTRAP and are requested to use the EMEP/Corinair Guidebook (Annex III of NECD) • EU Member States are requested to draw up a Emission Inventory Report • Reporting date of 31-12-2006 is not respected by all Member States; as a result the EC as a whole reported to the CLTRAP on 5/10/2005, almost 8 month late.

  8. National Programmes 2006 • Should describe measures (already implemented or to be taken) that will ensure compliance. • Should preferably be based on ‘Recommendations’ (as far as possible). • Deadline 31-12-2006, no delay will be accepted • Simultaneous reporting to both the Commission and the EEA is highly recommended by using: • Functional mailbox ENV NECD@ec.europa.eu • EIONET Central Data Repository

  9. Evaluation national programmes Service contract with 4 tasks: • In depth analysis of the national programmes; • Analysis of EU-25 – compliance to obligations under the NECD • NEC-review report • Stakeholder consultation Duration 15 months, but first interim report should be available 15/4/2006 at the latest.

  10. Future developments • Revision of the EMEP/Corinair Guidebook • Further integration of monitoring and reporting obligations for GHG’s and NEC-substances and HM’s and POP’s. Entry into force 2008/2009? • National programmes for 2012 and 2016? • Intermediate targets for 2015 and/or targets averaged over more than one year. • Fixed or relative ceilings do not make any difference, in case there is a safeguarded correction mechanism for unforeseen sources and unforeseen changes in emission factors (like Euro 3).

  11. END TFEIP & EIONET, 31 October -2 November 2006, Thessaloniki Eduard Dame DG ENV,Unit C5