1 / 9

1. FY08 GOES-R3 Project Proposal Title Page

1. FY08 GOES-R3 Project Proposal Title Page. Title : CIMSS Cal/Val Efforts in support of GOES-R Project Type : GOES Utilization Status : New Duration : 1 Year, with continuation under GOES-R Cal/Val project Leads: David Tobin, CIMSS Other Participants : Mathew Gunshor, CIMSS

shika
Télécharger la présentation

1. FY08 GOES-R3 Project Proposal Title Page

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1. FY08 GOES-R3 Project Proposal Title Page • Title: CIMSS Cal/Val Efforts in support of GOES-R • Project Type: GOES Utilization • Status: New • Duration: 1 Year, with continuation under GOES-R Cal/Val project • Leads: • David Tobin, CIMSS • Other Participants: • Mathew Gunshor, CIMSS • Robert Holz, CIMSS • Leslie Moy, CIMSS

  2. 2. Project Summary • Calibration/Validation efforts in support of GOES-R • CIMSS participation in GSICS meetings • CIMSS participation in GOES-R Cal/Val planning efforts • Analyses of benchmark aircraft validation datasets in support of GSICS • Simulation studies to estimate uncertainties in satellite sensor intercalibrations for Leo/Leo Simultaneous Nadir Obserpasses and Geo/Leo intercomparisons • Characterization and analysis of ARM site data for atmospheric sounding validation

  3. 3. Motivation/Justification • Supports NOAA Mission Goal(s): • Climate • Weather and Water • Establishment of GOES-RRR Cal/Val team • Continued development of key validation activities • Benchmark satellite observations for GSICS • Highly accurate sounding validation datasets

  4. 4. Methodology • Analyses of benchmark aircraft validation datasets in support of GSICS • Analyses of IASI and AIRS underflight data following Tobin, D. C., H. E. Revercomb, R. O. Knuteson, F. A. Best, W. L. Smith, N. N. Ciganovich, R. G. Dedecker, S. Dutcher, S. D. Ellington, R. K. Garcia,H. B. Howell, D. D. LaPorte, S. A. Mango, T. S. Pagano, J. K. Taylor, P. van Delst, K. H. Vinson, and M. W. Werner (2006), Radiometric and spectral validation of Atmospheric Infrared Sounder observations with the aircraft-based Scanning High-Resolution Interferometer Sounder, J. Geophys. Res., 111, D09S02, doi:10.1029/2005JD006094. • Simulation studies to estimate uncertainties in satellite sensor intercalibrations for Leo/Leo Simultaneous Nadir Obserpasses and Geo/Leo intercomparisons • Use MODIS and SEVERI data to characterize spatial and temporal sampling errors associated with various satellite intercomparison scenarios • Characterization and analysis of ARM site data for atmospheric sounding validation • Following Tobin D. C., H. E. Revercomb, R. O. Knuteson, B. M. Lesht, L. L. Strow, S. E. Hannon, W. F. Feltz, L. A. Moy, E. J. Fetzer, T. S. Cress (2006), Atmospheric Radiation Measurement site atmospheric state best estimates for Atmospheric Infrared Sounder temperature and water vapor retrieval validation, J. Geophys. Res., 111, D09S14, doi:10.1029/2005JD006103

  5. 5. Summary of Previous Results • Use of Scanning-HIS and NAST-I data to establish on-orbit, NIST traceable uncertainties of AIRS and IASI observations for use as benchmrak datasets for GSICS • Estimation of spatial and temporal sampling errors associated with intercalibration of a benchmark satellite sensor (CLARREO) with AIRS on EOS Aqua • Detailed characterization of AIRS team temperature and water vapor sounding retrievals

  6. 6. Expected Outcomes • Detailed characterization of benchmark observations for GSCIS • Development of key cal/val activities for GOES-R • CIMSS expertise represented in GOES-R Cal/Val planning

  7. 7. Major Milestones • FY08 • Complete simulation study of spatial and temporal mis-match errors for Geo/AIRS intercomparisons • Complete analyses of IASI aicraft underflights and document results for GSICS • Participation in GSICS and/or GOES-R Cal/Val meetings • FY09 • xx

  8. 8. Funding Profile (K) • Summary of leveraged funding • Aircraft efforts supported by NASA and IPO • ARM efforts supported by NASA

  9. 9. Expected Purchase Items • FY08 • (60K): STAR CIMSS Grant for 2 people (0.25 and 0.25) time from Jan 08 to Dec 08 • Personnel support (including benefits, IT charges, overhead, etc): 50K • Contracts: N/A • Software charges: N/A • Travel (two Madison - DC trips) - 4K • Publication Charges - 6K • FY09 • (60K): STAR CIMSS Grant for 2 people (0.25 and 0.25) from Jan 08 to Dec 08 • Personnel support (including benefits, IT charges, overhead, etc): 50K • Contracts: N/A • Software charges: N/A • Travel (two Madison - DC trips) - 4K • Publication Charges - 6K • FY10 • (xK): xx STAR CICS Grant for x people at y time from MMM YY to MMM YY • Xxx • Xxx • Xxx • (xK): STAR Software Contractor for x people at y time from MMM YY to MMM YY • Xxx • Xxx

More Related