1 / 11

H igh Energy H igh Intensity H adron Beams

Network. coordinated by W. Scandale and F. Zimmermann. report to Governing Board preliminary work program and budget request. H igh Energy H igh Intensity H adron Beams. http://care-hhh.web.cern.ch/care-hhh/. deliverables & milestones. deliverables 2004: HHH & HHH-APD web site => OK

Télécharger la présentation

H igh Energy H igh Intensity H adron Beams

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Network coordinated by W. Scandale and F. Zimmermann report to Governing Board preliminary work program and budget request High EnergyHigh IntensityHadron Beams http://care-hhh.web.cern.ch/care-hhh/ HHH, CARE’07, CERN, October 29-31, 2007

  2. deliverables & milestones • deliverables • 2004: HHH & HHH-APD web site => OK • 2005: creation of web-based beam dynamics code repository => OK • http://oraweb.cern.ch:9000/pls/hhh/code_website.startup • 2007: web based database for s.c. cables and magnets => OK, http://sdb.web.cern.ch/sdb • frequently visited! • milestones: • web reference for IR optics => OK • http://care-hhh.web.cern.ch/care-hhh/SuperLHC_IRoptics/IRoptics.html • booster synchrotron optics => delayed to 2008 • structured list of intensity limits => nearing completion • scaling laws for magnet and cryogenic cost => 2008 2 summer students + 1 doctoral student code for importing FNAL and BNL data almost complete; ITER, NED and US-LARP also being looked at 1 summer student HHH, CARE’07, CERN, October 29-31, 2007

  3. WP1: Advancements in Accelerator Magnet Technologies (AMT) HHH, CARE’07, CERN, October 29-31, 2007

  4. planned AMT workshops • 19-20 November 07: CARE-HHH-AMT workshop onHeat Generation and Heat Transfer in Superconducting Magnets (THERMOMAG’07), Paris, 2 days • minimizing and evacuating heat in the next generation of superconducting magnets for high intensity particle accelerators, such as the IR magnet for the LHC luminosity upgrade and the fast cycling magnets for FAIR and for the LHC injector chain upgrade; • identify the state of the art on (1) cooling techniques (fluids and regimes), (2) heat transfer mechanisms, (3) modeling of heat transfer from coils to cooling system, (4) heat transfer experiments; identify a common set of thermal design criteriaSpring 08 • Spring 08: a conclusive workshop → CARE’07 HHH highlight talk by D. Tommasini HHH, CARE’07, CERN, October 29-31, 2007

  5. WP2: Novel Methods for Accelerator Beam Instrumentation (ABI) HHH, CARE’07, CERN, October 29-31, 2007

  6. planned ABI workshops • Dec. 2007: HHH-ABI annual workshop on Tools for Diagnostic Systems at High-Intensity (Pre-) Accelerators; Emittance Preservation and Measurements in the Accelerator Chain, Chamonix, France • Dec. 08: a conclusive workshop HHH, CARE’07, CERN, October 29-31, 2007

  7. WP3: Accelerator Physics and synchrotron Design (APD) HHH, CARE’07, CERN, October 29-31, 2007

  8. planned APD workshops • 7-9 November: CARE-HHH-APD workshop onLHC IR Upgrade (LUMI'07), INFN Frascati, Italy • new low-beta quadrupoles, • detector-integrated dipoles and quadrupoles, • crab cavities, • wire compensation, • experience with new DAFNE IR (crab waist IR) • Spring 08: CC 08 on crystal collimation • Spring 08: CRAB 08 on crab cavity progress • Fall 08: a conclusive workshop (LUMI 08) HHH, CARE’07, CERN, October 29-31, 2007

  9. Gantt chart until end of 2008 AMT and ABI HHH, CARE’07, CERN, October 29-31, 2007

  10. Gantt chart until end of 2008 APD HHH, CARE’07, CERN, October 29-31, 2007

  11. conclusions -work program & budget • support for HHH scientist exchanges • 8 more workshops from now until end of 2008 • final report on HHH including: • final report on HHH-AMT • final report on HHH-ABI • final report on HHH-APD • funds still available: about 40 keuro HHH, CARE’07, CERN, October 29-31, 2007

More Related