160 likes | 220 Vues
Explore a comprehensive guide to shrink stope construction, highlighting safety procedures, equipment placement, and key points for effective project management.
E N D
Note: This picture shows a typical shrink stope and should not be confused with the problem.
. . . . . . . North . . . . . . . 1 inch equals 10 feet Field 60 feet wide 70 feet deep . . . . . . . . . . . . . . . . . . . . . . D . . . . . . . . D . . . . . . . . . . . D . . . D . . . Construction map D
North 6 7 1 5 4 4 A B C 8 Alfa Stope 9 Man way Draw point Draw point Draw point Man way 11 12 Man way Draw point Draw point Draw point Man way A B 16 C 9 Bravo Stope 2 18 4 9 13 10 12 3 2 Man way Draw point Draw point Draw point Man way A B C 19 Charlie Stope 19 Placard layout 2000 level 16 12 1 12 19 2 2 14 15 Portal In cast 17 4
North water over knee deep Powder Magazine 1 inch equals 10 feet Field 60 feet wide 70 feet deep Clear air Pump control Fire extinguisher Fire extinguisher A B C 6 post Alfa Stope loose Non-scalable Man way Draw point Draw point Draw point Man way Team All American has four sets of stopping's Mucker on Fire intense heat Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% Man way Draw point Draw point Draw point Man way A loose Non-scalable B PC 110 volt C Bravo Stope shop D Fire extinguisher Loose non scalable Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% 200 hp Non-reversible fan Cap Magazine Four sets of building material D Mucker Man way Draw point Draw point Draw point Man way A B C Charlie Stope Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% PC 110 volt Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% Up cast shaft Clear air Problem Map 2000 level D D Portal In cast Tool crib Portable potty office Fire extinguisher D
A B C Alpha Stope Man way Draw point Draw point Draw point Man way Draw point Man way Draw point Draw point Man way A B C Bravo Stope Man way Draw point Draw point Draw point Man way A B C Charlie Stope Team/FAB Map 2000 level Portal In cast Up cast shaft
A B C Alpha Stope Man way Draw point Draw point Draw point Man way Draw point Man way Draw point Draw point Man way A B C Bravo Stope Man way Draw point Draw point Draw point Man way A B C Charlie Stope Judges Map 2000 level Portal In cast Up cast shaft
2200 level Scram drift Ore body W E S T E A S T Shrink Stope Man way Broken ore Broken ore Broken ore Draw Point A Draw Point C Draw Point B Man way Man way 2000 level Team/FAB map Alpha Stope
2200 level Ore body Scram drift W E S T E A S T Mined out Open Stope Mined out Open Stope Empty draw Point A Empty draw Point B Empty draw Point C Man way Man way 2000 level Team/FAB map Bravo Stope
2200 level Scram drift Ore body Shrink Stope E A S T W E S T Man way Broken ore Broken ore Broken ore Draw Point C Draw Point A Draw Point B Man way Man way 2000 level Team/FAB map Charlie Stope
2200 level Scram drift Ore body W E S T E A S T Shrink Stope All American Team build Man way Broken ore Broken ore Broken ore Draw Point A Draw Point B Draw Point C Man way Man way 2000 level Team/FAB map Alpha Stope
2200 level Ore body Scram drift Between Bravo and Charlie All American Team build W E S T E A S T Mined out Open Stope Mined out Open Stope Empty draw point A Empty draw point C Empty draw point B Man way Man way 2000 level Team/FAB map Bravo Stope
2200 level All American Team build Scram drift Ore body Located between Bravo and Charlie Shrink Stope E A S T W E S T Man way Broken ore Draw point A Draw point B Draw point C Man way Man way 2000 level Team/FAB map Charlie Stope
North MW= Man Way MW Alpha MW Bravo MW MW Charlie MW MW D shaft Team/FAB 2200 level
EAST 2180 level Scram drift ties all three Stopes together SOUTH NORTH Team/FAB Map Alpha Stope Bravo Stope Charlie Stope 2000 level WEST
North Sump Over knee deep Powder magazine Clear air Pump control Fire extinguisher All American Team build Top (T) 4 Seals. Team builds bottom (B) 3 seals Fire extinguisher A B C Alfa Stope Scaled And timbered Man way Draw point Draw point Draw point Man way T Bottom Of man way Mucker on Fire intense heat Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% B B B T scram drift 2180 level Man way Draw point Scaled And timbered Draw point Draw point Man way T A B PC 110 volt C Top of Man way Bravo Stope shop D Fire extinguisher Loose back 200 hp Non reversible fan Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% Mucker Cap Magazine Four sets of building material D T scram drift 2180 level Man way Draw point Draw point Draw point Man way A B C Charlie Stope Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% PC 110 volt Clear air Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% Up cast shaft Fire solution Map 2000 level D D Portal In cast Tool crib Portable potty office Fire extinguisher D
North Sump Over knee deep Fan on Powder Magazine Clear air Pump control 1. Fire extinguisher • Build brattice • Build wing brattice and remove shop man • Build wing brattice and remove office man Fire extinguisher A B B C Alfa Stope Scaled And timbered Man way Draw point Draw point Draw point Man way T Bottom Of man way Mucker on Fire intense heat Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% B B B T scram drift 2180 level Man way Draw point Draw point Draw point Man way T A B PC 110 volt C Scaled And timbered Top of Man way Bravo Stope shop D Fire extinguisher Loose back 200 hp Non reversible fan Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% Mucker WB Cap Magazine 2. Four sets of building material D T scram drift 2180 level Man way Draw point Draw point Draw point Man way A B C Charlie Stope 3. PC 110 volt Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% Up cast shaft Clear air Heavy Smoke CO-1850 ppm CO2- 800 ppm NO2- 50 ppm O2-12% Ventilation Solution Map 2000 level D D Portal In cast Tool crib Portable potty office Fire extinguisher D