10 likes | 139 Vues
This document outlines the inspection and maintenance procedures for the cooling system of the CIWS. It covers the condition and necessary repairs for the forward engine room spray pipes, including the identification of pipe breaks #1 through #4. Proper assessment and remediation techniques are detailed to ensure optimal cooling system performance and to prevent equipment failure.
E N D
AFTER ENG RM OVHD SPRAY FWD ENG RM SPRAY SPS 49 COOLING CIWS COOLING PIPE BRK #4 PIPE BRK #3 PIPE BRK #2 PIPE BRK #1