1 / 1

Cooling System Inspection and Repair for CIWS Spray Pipes

This document outlines the inspection and maintenance procedures for the cooling system of the CIWS. It covers the condition and necessary repairs for the forward engine room spray pipes, including the identification of pipe breaks #1 through #4. Proper assessment and remediation techniques are detailed to ensure optimal cooling system performance and to prevent equipment failure.

sissy
Télécharger la présentation

Cooling System Inspection and Repair for CIWS Spray Pipes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AFTER ENG RM OVHD SPRAY FWD ENG RM SPRAY SPS 49 COOLING CIWS COOLING PIPE BRK #4 PIPE BRK #3 PIPE BRK #2 PIPE BRK #1

More Related