1 / 9

Related Rates Project

Related Rates Project. May 28-29 Related Rates Review May 30 Groups Due May 30 Related Rates Packet Due June 4 Related Rates Project Topic Due June 9 Related Rates Presentations Begin. Related Rates Project.

skylar
Télécharger la présentation

Related Rates Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Related Rates Project May 28-29 Related Rates Review May 30 Groups Due May 30 Related Rates Packet Due June 4 Related Rates Project Topic Due June 9 Related Rates Presentations Begin

  2. Related Rates Project • You will be reenacting a related rates problem of your choice (see packet for ideas) • You may create your own problem • Use your own measured rates and values • June 9-13 each group will present their related rates problem • Presentations will either be reenactments in class or a video of the reenactment done out of class • A write-up of the problem is due June 9 • Groups of maximum 3-4

  3. Related Rates Review • When we use implicit differentiation, we obtain dy/dx, or the change of y in terms of x. • In many real life situations, each quantity in an equation changes with time (or another variable) • In this case, any derivative we find is called a related rate, since each rate in the derivative is related to each other

  4. Related Rates Steps • 1) Make a simple sketch, if possible • 2) Identify what rate you are looking for • 3) Set up an equation relating ALL of the relevant quantities • 4) Differentiate both sides of the equation in terms of the variable you want • if you want dv/dt, you differentiate in terms of t • 5) Substitute in values we know • 6) Solve for the remaining rate

  5. Ex 1 • A 5-meter ladder leans against a wall. The bottom of the ladder is 1.5 m from the wall at time t=0 and slides away from the wall at a rate of 0.8m/s. Find the velocity of the top of the ladder at time t=1

  6. Ex 2 • Water pours into a fish tank at a rate of 0.3 m^3 / min. How fast is the water level rising if the base of the tank is a rectangle of dimensions 2 x 3 meters?

  7. Ex 3 • Water pours into a conical tank of height 10 m and radius 4 m at a rate of 6 m^3/min • A) At what rate is the water level rising when the level is 5 m high? • B) As time passes what happens to the rate at which the water level rises?

  8. Ex 4 • A spy uses a telescope to track a rocket launched vertically from a launching pad 6km away. At a certain moment, the angle between the telescope and ground is equal to pi/3 and is changing at a rate of 0.9 radians/min. What is the rocket’s velocity at that moment?

  9. Related Rates Project • May 30 Groups Due • June 2 Related Rates Packet Due • June 4 Related Rates Project Topic Due • June 9 Related Rates Presentations Begin Today • June 9 Write-up Due (Regardless of when you present)

More Related