1 / 11

WP4 Status and outlook

WP4 Status and outlook. Hartmut Hillemanns. TTN Meeting, 10./11. December 2009. Why a MPGD - Pilot Proposal ?. First pilot case: Micro Pattern Gaseous Detectors

Télécharger la présentation

WP4 Status and outlook

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP4 Status and outlook Hartmut Hillemanns TTN Meeting, 10./11. December 2009

  2. Why a MPGD-Pilot Proposal ? • First pilot case: Micro Pattern Gaseous Detectors • Large collaborative R&D efforts from PP community (RD-51, more than 60 institutions involved, not only PP institutes, important interest from industry); • Good case to define a collaborative scouting model • Evidence for patent pooling (GEM, micromegas, front-end readout, software, etc.) • Very good case for the development of a collaborative push and pull model • First data to test community building tools; specify value and meaning of a PP brand • Test of concerted communication strategy • Important and very visible case currently addressed by members of the TT Network individually with a limited collaboration at the TTO level • TT Network member institutes participating in RD-51 • CEA, CERN, CNRS, DESY, INFN, GSI • NTU, KFKI (TT Network Observer) TTN, June 11, 2010

  3. Achievements and To Do’s • Achievements: • WP4 core team constituted • RD51 collaboration informed • TTN member contact persons for RD51 identified • MPGD Inventory • To do’s: • MPGD Inventory Consolidation • MPGD Offer building • Offer presentation TTN, June 11, 2010

  4. MPGD Inventory • Collect information on MPGD related technology: • GEM, Micromegas, THGEM, Ingrid, etc. • Medipix, VFAT, NINO, HPTDC, etc. • SRS, etc. • Production of GEM, THGEM, etc. • Applications • Facilities • Patents • Classify along a conceptual detector scheme TTN, June 11, 2010

  5. MPGD Conceptual Detector TTN, June 11, 2010

  6. Classification of MPGD solution elements CsI NINO HPTDC GEM Scalable Readout System Counting Gases Micromegas VFAT DABC THGEM Medipix DCS Ambient Air RETGEM AP25 Neutron Conversion InGrid Gastone Resistive Mesh DIRAC2 AFTER Sealed GEM Timepix TiPC GTK/NA62 Expertise (Engineering, Production, Packaging, Integration, Operation, Testing, Quality), Facilities, Simulation SW TTN, June 11, 2010

  7. Key Requirements from Specific Applications (1/3) TTN, June 11, 2010

  8. Key Requirements from Specific Applications (2/3) TTN, June 11, 2010

  9. Key Requirements from Specific Applications (3/3) TTN, June 11, 2010

  10. From Technology Bricks to Solution Packages: How to Proceed ? Role of TTO: • MPGD inventory maintenance, market analysis, IP situation, MPGD technology offer Role of Researcher: • Validation of MPGD technology inventory, validation of key requirements, consultancy for technology offer TTN, June 11, 2010

  11. WP4: High Level Work Plan • MPGD Inventory: • Technologies, expertise, patents • Services • Facilities IP situation Patent pooling opportunities Risks and barriers • Common technology offer building: • Collaborative pull • IP Handling • TTN website • Branding & communication Consolidation and Analysis 9/10 8/10 4/10 7/10 1/10 2/10 3/10 6/10 12/09 5/10 Months TTN, June 11, 2010

More Related