socorro-xovi
Uploaded by
17 SLIDES
290 VUES
170LIKES

Advancing Wind Energy Projects: Insights from EverPower's Multi-State Developments

DESCRIPTION

EverPower's wind energy projects, including the Buckeye Wind Project in Ohio (100 MW) and the Highland Wind Project in Pennsylvania (115 MW), highlight the significance of integrating wind flow management with timber production. The Allegany Project in New York (65-80 MW) and the Howard Wind Project (50-60 MW) demonstrate how proper vegetation management and anemometer data can enhance energy efficiency. EverPower's commitment to environmental assessments ensures compatibility between tree farms and wind parks while closely monitoring local wildlife, such as the Marbled Murrelet and Spotted Owl.

1 / 17

Télécharger la présentation

Advancing Wind Energy Projects: Insights from EverPower's Multi-State Developments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EverPower Eastern Projects • Buckeye Wind Project • Champaign & Logan Counties, Ohio • 100 MW • Highland Wind Project • Krayn, Pennsylvania • 115 MW • The Allegany Project • Allegany, New York • 65-80 MW • Howard Wind Project • Howard, New York • 50-60 MW

  2. Anemometers on Weyerhaeuser Property Anemometers on Weyerhaeuser Property

  3. Correlation of Wind Flow and Timber Production P = 1/2d x A x V3 • Upwind trees can reduce wind velocity by causing turbulence • Clearing/vegetation management maintains power production efficiency

  4. Effect of Wind Power Harvesting on Timber Management Wind Box Identifies the area to be cleared to facilitate energy production Wind Rose Identifies energy to be harvested

  5. Wind Box Estimate Each Turbine Site: • Construction area • 2 acres – already cleared for turbine installation • Wind flow clearing area • 0 acres 12.5 acres (depending on topography)

  6. Defining Wind BoxDesign Parameters Nordex N90: 2.3 mw

  7. Rotor Blade

  8. Laydown Area

  9. Laydown Area

  10. Conducting Biological Assessments • Tree farms and wind parks are compatible • Work with Weyerhaeuser data • Limited ESA risks • EverPower is monitoring Marbled Murrelet, Spotted Owl, bats, & others

  11. Development ProcessMarkets Key Factors • Transmission interconnection • Power market • Utility off-takers

  12. RPS Requirements

  13. Turbine Manufacturers

  14. EPC Contracting Turbine Supplier’s Role • Turbine and Tower • Delivery • Commissioning • Warranty turbines with staff

  15. Development Schedule

More Related