1 / 39

Auburn - Kent Joint Ad Hoc Committee

Auburn - Kent Joint Ad Hoc Committee. Report to Boards May 17, 2006. Kent School District Joe Fain, Co-chair Tina Busenius Richard Koch Doug Sharnhorst. Auburn School District Mike Hamilton, Co-chair Teresa McFadden Tim Moe Pat Montgomery Frank Pratt. Committee Members.

sorcha
Télécharger la présentation

Auburn - Kent Joint Ad Hoc Committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Auburn - Kent Joint Ad Hoc Committee Report to Boards May 17, 2006

  2. Kent School District Joe Fain, Co-chair Tina Busenius Richard Koch Doug Sharnhorst Auburn School District Mike Hamilton, Co-chair Teresa McFadden Tim Moe Pat Montgomery Frank Pratt Committee Members Facilitators – Fred High and Mike Newman

  3. Overview • Review of Charge and Study Area • Problem-solving Assumptions • Enrollment and Capacity • Scenarios • Current and Future Service • Criteria • Recommendations and Impacts

  4. The Board’s Charge • Review the boundary between Auburn and Kent • Consider logistics, fiscal impacts and community impacts regarding housing students in the Study Area • Study ten-year enrollment projections

  5. Map of the Area

  6. Map of Study Area

  7. Study Area Situation • Significant New Development 2006-14 • Difficult for Kent School District to serve • 45 Current Students • Approximately 630 New Students • Significant Property Value in Study Area • Additional New Development 500+ outside of Study Area in North Auburn

  8. Problem-Solving Assumptions • 543 Single Family and 633 Multi-Family • Average Student Generation Factors • Single Family .7851 • Multi-Family .3198 • 630 Students Generated from Study Area by 2014 • 50% Build out 2010, 100% by 2014

  9. Problem-Solving Assumptions • 5% Annual Assessed Valuation Growth • School Construction Costs Similar • School Impact Fees (2006) • Kent Rates – Approximately $4,500,000 • Auburn Rates - Approximately $4,100,000

  10. Enrollment and Capacity • Students generated from Study Area could be served by both districts

  11. Enrollment and Capacity

  12. Kent School District Capacity • Projected enrollment shows increasing need for Elementary Schools • Need 3 elementary schools through 2015 to accommodate growth • One school is funded • Middle and High School have capacity • Opening of Alternative High School

  13. Auburn School District Capacity • Opening 2 new elementary schools • 2006 Lakeland Hills Elementary • 2007 Elementary #14 (Lea Hill area) • Middle School planned for 2009-10 • Capacity beyond study period • High School capacity through 2013 without portables

  14. Scenarios • Scenario I – Study Area Remains with Kent School District • Scenario II – Study Area to Auburn School District • Scenario III – Study Area Split between Auburn and Kent School Districts

  15. Scenario IIIA • Area Split Between Auburn and Kent • Union Pacific Railroad

  16. Study Area Map

  17. Current and Future Service

  18. Service to Study Area

  19. Existing Service

  20. Kent School District • Secondary Students • Mill Creek Middle School • Kent-Meridian High School • Elementary • 2006-2009 Combination of schools • 2010 Kent Elementary School • 2014 Kent and Meadow Ridge Elementary

  21. Location of Schools

  22. Auburn School District • Secondary Students • Cascade Middle School • Auburn High School • Elementary Students • Dick Scobee Elementary • Evergreen Heights Elementary • Potential Need for New School or • Changes in Attendance Areas

  23. Scenario Review Criteria • Community Impacts • Sense of Community • Existing Students in Study Area • Demographics • Community Perception

  24. Scenario Review Criteria • Logistics • Transportation • School Capacities • Transition for Displaced Students • Timing

  25. Scenario Review Criteria • Fiscal Impacts • Funding New Schools • General Fund Impacts • Tax Rate Impacts • Impact of Tax Rates in Study Area • Impact of Tax Rates on District Patrons • Timing

  26. Scenario Review Criteria • Legal Considerations • RCW 28A.315 – Transfer of Territory • WAC 180-24-210 – Adjustments to Assets and Liabilities (Phase in 2 to 8 years) • WAC 180-24-213 – Student Enrollment Effective Under Approved Transfer

  27. Recommendation • Scenario IIIA – Study Area Split between Auburn and Kent School District • Recommendation Area Phased in Over Time • Residential Development • Minimize impact on patrons in Kent School District • Grandfather Existing Students to Kent

  28. Phase-In Plan

  29. Phase-In Plan Sections • Section 1 – Area West of Green River to Auburn Way North • Includes Planned Residential Developments • Current Assessed Valuation - $54,600,000 • Timing – As soon as possible

  30. Phase-In Plan Sections • Section 2 – West of Auburn Way North to B Street • Includes Industrial Commercial Area and some existing residences • Current Assessed Valuation - $56,050,000 • Timing – For tax collection in 2010

  31. Phase-In Plan Sections • Section 3 – West of B Street to Union Pacific Railroad • Includes Industrial Development • Current Assessed Valuation $87,500,000 • Timing – For tax collection in 2014

  32. Phase-In Plan Sections • Section 4 – West of Union Pacific Railroad to Auburn City Limits • Area Zoned M-1, some existing residences • Current Assessed Valuation $50,700,000 • Timing – Area Remains with Kent School District

  33. Map of Recommendation Area

  34. Impacts on Kent School District Patrons • Reduces need to displace students on large scale • Reduces need for additional buses • Loss of Existing AV of 1.7% in 2006 • By 2014 Tax Rate projected to remain at current level of $4.59, rather than decreasing to $4.46. • Delays need for Elementary School beyond 2010. • Loss of School Impact Fees from area

  35. Impacts on Auburn School District Patrons • Projected to reduce School Tax Rates from $5.36 to $5.32 in 2006 and projected to decrease to $4.72 in 2014 • May need additional Elementary School • Additional transportation costs • School Impact Fees to be collected from Recommendation Area

  36. Impacts on Recommendation Area Patrons • Students live in Auburn go to school in Auburn • Grandfathering and Waivers • Increases School Tax Rate from $4.59 to $5.32 • Approximately 73 cents per $1000 AV • Rate projected to decline to $4.72 by 2014

  37. Next Steps • Each Board commits to agreement by resolution • Develop phase in timelines • Determine student attendance

  38. Questions

More Related