1 / 29

Status of Recent Detector Deployment(s) at SONGS December 14, 2007

Nathaniel Bowden Advanced Detectors Group Lawrence Livermore National Laboratory. Status of Recent Detector Deployment(s) at SONGS December 14, 2007.

sorcha
Télécharger la présentation

Status of Recent Detector Deployment(s) at SONGS December 14, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nathaniel Bowden Advanced Detectors Group Lawrence Livermore National Laboratory Status of Recent Detector Deployment(s) at SONGS December 14, 2007 This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory in part under Contract W-7405-Eng-48 and in part under Contract DE-AC52-07NA27344. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company,for the United States Department of Energy under contract DE-AC04-94AL85000

  2. Introduction • Since 2003 a small detector based on Gd loaded liquid scintillator has been deployed at a commercial plant in the US (SONGS) • This relatively simple and non-invasive design has demonstrated remote and unattended monitoring of: • reactor state (power level, trips) • reactor fuel evolution (burnup) • Recently, we have been investigating several paths to more deployable detectors • Use of doped water Cerenkov detectors instead of scintillator • Use of less flammable and combustible, more robust, plastic scintillator

  3. Reactors Produce Antineutrinos in Large Quantities • ~ 6 Antineutrinos are produced by each fission: • Antineutrinos interact so weakly that • they cannot be shielded, • but small detectors have useful interaction rates • 0.64 ton detector, 24.5 m from 3.46 GW reactor core • 3800 events/day for a 100% efficient detector • Rate is sensitive to the isotopic composition of the core • e.g. for a PLWR, antineutrino rate change of about 10% through a 500 day PLWR fuel cycle, caused by Pu ingrowth Constant (Geometry, Detector Efficiency Detector mass) Fuel composition dependent Sum over fissioning isotopes, Integral over energy dependent cross section, energy spectrum, detector efficiency

  4. The fuel of a PLWR evolves under irradiation: 235U is consumed and 239Pu is produced The Antineutrino Production Rate varies with Fissioning Isotope: PLWR Example The energy spectrum and integral rate produced by each fissioning isotope is different Energy (MeV)

  5. Prediction for a PLWR Non-neutrino background

  6. LLNL/Sandia Antineutrino Detector “SONGS1” (2004-2006) • Detector system is… • ~1 m3 Gd doped liquid scintillator readout by 8x 8” PMT • 6-sided water shield • 5-sided active muon veto see NIM A 572 (2007) 985

  7. SONGS Unit 2 Tendon Gallery • Tendon gallery is ideal location • Rarely accessed for plant operation • As close to reactor as you can get while being outside containment • Provides ~20 mwe overburden • 3.4 GWth => ~ 1021n / s • In tendon gallery ~1017n / s per m2 • Around 3800 interactions expected per day (~ 10-2 / s) ~25 m

  8. Short Term monitoring – Reactor Scram • With a one hour integration time, sudden power changes can be seen • In this case, a scram is “detected” via SPRT with 99.9% confidence after 5 hours Manuscript accepted by JAP

  9. Relative Power Monitoring Precision Daily average 8 % relative uncertaintyin thermal power estimate (normalized to 30 day avg.) Weekly average 3% relative uncertaintyin thermal power estimate (normalized to 30 day avg.) Manuscript accepted by JAP

  10. Removal of 250 kg 239Pu, replacement with 1.5 tons of fresh 235U fuel SONGS1 Fuel Burnup Measurement

  11. SONGS1 was very successful, but…. • The liquid scintillator used is somewhat flammable, rather combustible, can spill • LS must be transported as a hazardous material, and is transferred onsite into the detector • With the SONGS1 run completed, we are leveraging the installed infrastructure to investigate several paths to more deployable detectors • Use of doped water Cerenkov detectors instead of scintillator • Use of less flammable and combustible, more robust, plastic scintillator

  12. Solid, non-flammable, less combustible, Plastic detector • Replace half of liquid scintillator with plastic scintillator (PS): • Must retain neutron capture capability, ideally on Gd - commercial neutron capture PS not suitable/available (e.g. Boron loaded BC-454) • Final design: 2 cm slabs of BC-408 PS, interleaved with mylar sheets coated in Gd loaded paint

  13. Such a design is a trade off: Reactor Operator/ Safeguards Agency Reduction in combustible inventory of ~ 40% No leakage or flammable vapour concerns No transportation of hazardous material required Preassembled Physics X Lower neutron capture efficiency on Gd (LS: 80% / 20% Gd/H PS: 60% / 40% Gd/H) X ~ 10% fewer protons/cc XDead material in main volume

  14. Design Optimization: Gd loading/PS thickness • Use a Geant4 simulation to explore the effect on neutron capture of varying: • Plastic slab thickness • Gd loading • Use 2 cm thickness, 20 mg/cm2 loading

  15. Design Optimization: Optical Modeling • Investigate several readout configurations to optimise position uniformity

  16. Construction

  17. Installation at SONGS

  18. Initial Plastic Data • The plastic detector responds to neutrons in the expected fashion: neutron captures on Gd are observed, as well as correlated (gamma,neutron) events from an AmBe neutron source Response to AmBe neutron source Correlated events PRELIMINARY Response to background at SONGS Inter-event time Energy

  19. Deployment Status STOP PRESS! • The plastic detector were successfully inserted into the SONGS Unit 2 Tendon Gallery during a two week campaign in August • The removal of liquid scintillator reduced the combustible inventory in the gallery by almost 40% • Neutron captures and correlated events are observed • We use a scheduled reactor outage beginning Nov. 27 to observe the detector antineutrino sensitivity……

  20. Plastic detector outage data PRELIMINARY

  21. Plastic detector outage data PRELIMINARY

  22. Conclusion • A robust antineutrino detector based on a large volume of commercial plastic scintillator has been designed, constructed and deployed • This device has several important advantages over the liquid scintillator that it replaces in a commercial reactor environment: • Non-flammable, non-hazardous, and no possibility of liquid spillage • Near complete preassembly is relatively simple • The device clearly observes reactor antineutrinos, i.e. can monitor reactor state • Forthcoming work will focus on detector stability and calibration, with a view to observing fuel burnup

  23. Test of compact steel shielding • Low density shielding is the bulk of the detector volume • Replace 60cm water shield with 10 cm steel and measure: • Change in gamma bkg - should be unchanged • Change in correlated bkg (antineutrino like) due to: • Neutrons not attenuated by the steel • Neutrons produced in the steel by cosmic ray muons

  24. Steel installation in Jan ‘07

  25. Steel results • We compare detector halves near and far from steel wall • As expected, gamma ray background is unchanged, but more neutrons get through, producing more correlated background

  26. Unscheduled SONGS Unit 2 outage • Unit 2 went down for one week in late October for unscheduled maintenance • Coincidently, wildfires came near the plant a few days later!

  27. 511 keV e+ 511 keV e p Gd n  ~ 8 MeV t ~ 30 ms Antineutrino Detection • We use the same antineutrino detection technique used to first detect (anti)neutrinos: ne + p g e+ + n • inverse beta-decay produces a pair of correlated events in the detector – very effective background suppression • Gd loaded into liquid scintillator captures the resulting neutron after a relatively short time • Positron • Immediate • 1- 8 MeV (incl 511 keV gs) • Neutron • Delayed (t = 28 ms) • ~ 8 MeV gamma shower (200 ms and 2.2 MeV for H capture) prompt signal + n capture on Gd

  28. Acknowledgements and Project Team Lawrence Livermore National Laboratory Alex Misner Prof. Todd Palmer Nathaniel Bowden (PI) Adam Bernstein Steven Dazeley Bob Svoboda David Reyna (PI) Lorraine Sadler Jim Lund Many thanks to the San Onofre Nuclear Generating Station