60 likes | 245 Vues
1.85m. F. D. F. D. D. D. D. D. D. D. D. D. D. F. F. F. F. F. TBL. F. F. F. D. D. DUMP. F. F. D. D. D. F. TL2’. DUMP. DUMP. 0.75. DUMP. TBTS. CALIFES Probe beam injector. ITB. DUMP. Transport path. 16 m. 16.5 m. 2.5m. 2.0m. 22.4 m. D. F. 8 m. F. F.
E N D
1.85m F D F D D D D D D D D D D F F F F F TBL F F F D D DUMP F F D D D F TL2’ DUMP DUMP 0.75 DUMP TBTS CALIFES Probe beam injector ITB DUMP Transport path 16 m 16.5 m 2.5m 2.0m 22.4 m D F 8 m F F F F F F F F D D D D D D D D 1 2m LIL-ACS LIL-ACS LIL-ACS 1.4m 3.0m 3.0m 22 m 6 m 42.5 m The CTF3 Test Beam Line (TBL) Status of TBL Steffen Döbert, CTF3 meeting, 14.05.2008
TL2 and TBL in CLEX 2008 TBL Prototype Module CB.VPI 0215 CB.DHD/DVD 0140 CB.DHD/DVD 0130 CB.PET 0220 CC.QDL 0920 CC.QFL 0910 CC.WCM 0960 CB.BPS 0210 CB.QDR 0200 CB.QDM 0120 CB.QFM 0110 CB.VPI 0135 CC.BPM 0930 CC.BPR 0915 CB.BPM 0150 CB.VVS 0100 CM.BHL 0100 CC.MTV 0970 CC.VVS 0900 CB.BPM 0250 CCS.MTV 0980 CB.MOV 0205 CC.DHD/DVD 0940 CC.VPI 0950 CCS.VPI 0990 TL2’ to TBTS CCS.DUM 0995
Status of the prototype components • PETS (CIEMAT): rf design finished, PETS prototype bar successfully manufactured Full PETS manufacturing and tank design progressing • BPM’s (Valencia and Barcelona): one analog unit finished and tested at CERN, 2 BPM prototypes assembled and ‘cold’ tested at CERN Funds for series production allocated • Quads (CERN): Design by Th. Zickler finished, prototype in June, series ordered with BINP • Quad-Movers (CIEMAT): prototype fully tested at CERN series production under preparation • High power rf (CERN): directional couplers, loads and waveguide components ordered • Low Level rf (CERN): being manufactured • TL2’ diagnostics (CERN): Currently installed
Installation In progress, girders and quads mounted in CLEX Currently planned to be finished in June 2008, (looks like PETS tank might be slightly delayed)
Tentative TBL-Schedule Basic plan is to install the full beam line, including Quads with movers, BPM’s, replacement pipes for PETS tanks and the end of line diagnostic section during the next shutdown 2008/2009 After that PETS tanks will be installed as they get fabricated and delivered to CERN until 2010