Hydrograph Modification Management: Importance, Techniques, and Analysis

Explore the importance of Hydrograph Modification Management and the techniques used, such as Low Impact Development controls. Learn about the technical analysis behind pre-sized IMPs and the effects of urbanization on watersheds.

ssears
Télécharger la présentation

Hydrograph Modification Management: Importance, Techniques, and Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Major Topics to Address • Why Hydrograph Modification Management is important • How Low Impact Development controls work • Describing the technical analysis that generated the set of pre-sized IMPs

  2. Effects of Urbanization • Impervious surfaces produce higher runoff rates, volume and duration of large flows

  3. Effects within the Watershed • Urbanization alters the watershed • Channels respond with incision and/or armoring

  4. Continuous Hydrologic Modeling Examines Full Range of Local Conditions • Sizing to one ‘design storm’ is not enough

  5. Peak Flow Frequency(Partial Duration Statistics) • Identify all HSPF storms in record and rank

  6. Flow Durations • Rank hourly outputs from HSPF model

  7. Example IMP: In-Ground Planter 18-in sandy loam

  8. Peak Flow Matching Example

  9. Duration Matching Example

  10. BMP Sizing Factor Summary Under-Drain or Infiltration: Infiltration Only:

  11. Adjusting IMP Sizing to Account for Rainfall Variability

  12. Sizing Conclusions for Implementation • IMPs in Group D soil sites are generally smaller than Group A soil BMPs • Steep side walls produce smaller sizing factors • Sizing factor may be particularly important for on-site BMPs • Swales and Bioretention basin footprint may be less important if BMPs fit into otherwise undeveloped space

  13. Questions?

  14. Contra Costa Approach to Hydrograph Modification • Encourage LID to control stormwater flows • HMP is technically rigorous and easy to apply • Assumes need to match pre-project condition

  15. BMP Gallery

  16. BMP Gallery

  17. Instructions for Computing Local Sizing Factors • Describe each DMA on the project site, including area, soil type, post-project surface type • For DMA's draining to IMPs, select an IMP and configuration (e.g. swale width, dry well depth) • Pick the appropriate sizing factor from the summary sizing factor table (see handout) • Compute the rainfall adjustment using the regression equations (see handout) • Local sizing factor = Sizing Factor x RainAdj