An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRENCH RESCUEOperations/Awareness Level Wikipedia, Trench rescue is a specialized form of rescue, a subset of confined space rescue. Trench rescue involves shoring up the sides of a trench, and digging a trapped worker out of a collapsed ditch. Trench rescue is one of the most dangerous rescue operations to complete.

  2. OBJECTIVES -Recognize hazardous trench situations -Understand risk/benefit analysis in trench rescue (rescue vs. recovery) -Insure site safety and perimeter control -Resources/Equipment knowledge -Be able to initiate trench rescue actions

  3. PURPOSE:The purpose of this class is to help you deal with a trench collapse as an“Awareness & Operations level responder”, as required byWashington State Law.this class will meet the standards established in NFPA 1670 for theAwareness & Operations level responder

  4. What is a Trench???

  5. Trench Vs. Excavation • Trench: • A trench is defined as an • excavation in the ground deeper than it • is wide, but not wider than 15’ at the • base. • Excavation: • Is wider than it is deep and more than 15’ wide.

  6. RISK/BENEFIT ANALYSIS (rescue or recovery) • 1 cubic foot of soil weighs 100-150 Lbs • 18” of soil on top of a human totals 2500-3000 Lbs • Victims buried above the waist will asphyxiate rapidly • RECOGNIZE WHEN THERE IS NO CHANCE FOR RESCUE!!!

  7. Initial TACTICAL CONSIDERATIONS • ON SCENE--- SIZE-UP/ESTABLISH COMMAND • • First arriving company officer should establish Command and initiate a • size-up of the situation • • The first-in company should spot the apparatus at least 100’ from the • location of the trench failure. Establish staging at least 300’ from the • scene • • Complete a risk benefit analysis – RESCUE mode • • Call for resources – “Trench Rescue Response” • • Complete lock out/tag out, as applicable • (remember to assess the trench from the ends)

  8. Initial company operations • -Make patient contact (again from the end of the trench) • -place ladder/ladders • -If patient is capable, throw him/her a shovel • -secure scene • -shut off all equipment • -remove all people from the scene • -tape off scene (at least 100’) • -Gain information • -Purpose of the trench • -Number of victims • -Potential hazards

  9. Initial company operation (continued) • -Determine exactly what has happened • -Why were they digging (new vs. old trench) • -What time was the collapse • -How many patients • -Last known location • -Protect the patient • (If enough personnel, assign someone to stay with the patient, if not, mark patient location) • -Uncover the patient to their waist • -Provide them with head and eye protection • -Provide them with a tool to dig • -Consider oxygen

  10. Safety • OSHA trench shoring regulations state: • • Trench 4’ deep must have ladders every 25’ • • Spoil pile not less than 1’ from lip • • Trench greater than 5’ deep, spoil pile more than 2’ from lip • • Trench greater than 4’ must have protection for workers

  11. TOOLS AND LOCATION (LADDER 42) REARDRIVERSSIDE Tailboard

  12. Tools and location (continued) Box#1 Contents

  13. Tools and Location (continued) Box #2 contents

  14. Tools and Location (Continued) Dead-man/Manifold Panel ropes/bolts

  15. Tools and Location (continued) Spot shores Hammers/nails/ Tool belts/tape measures

  16. Building a strut Feet/extension/strut Built with ropes and air line attached

  17. Dead-man and manifold connections Bottle/Manifold/Hose Dead-Man/Hose (to strut) Connected to strut (throw of strut is indicated by two yellow lines)

  18. Assembled panel(strongback, panel, bolts, rope)

  19. good idea/Bad idea?

  20. Rescue?(remember it’s a cat, not a dog)

  21. Safety-Safety-Safety • EVERYONE GOES HOME!!!!

  22. 3rd Qtr. 2012 Trench Rescue Manipulative Outline (Link to document) Following the classroom section, the students shall become familiar with the following Equipment: Deadman and manifold -location -assembly -operation Struts -location -assembly -operation Panels/strongbacks, spot shores/skip shores, ground pads, whalers -location -assembly -placement -proper use/limitations Ladders -uses -placement -limitations