1 / 10

Southwest Washington ITS Traffic Data Collection & Analysis : A Tale of 3 Projects

Southwest Washington ITS Traffic Data Collection & Analysis : A Tale of 3 Projects. Jill MacKay ITE Traffic Simulation Roundtable October 4, 2012. Three Projects. C-TRAN/City of Vancouver TSP Before/After Evaluation

stefan
Télécharger la présentation

Southwest Washington ITS Traffic Data Collection & Analysis : A Tale of 3 Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Southwest Washington ITS Traffic Data Collection & Analysis:A Tale of 3 Projects Jill MacKay ITE Traffic Simulation Roundtable October 4, 2012

  2. Three Projects • C-TRAN/City of Vancouver TSP Before/After Evaluation • Purpose: Evaluate transit and traffic operations performance impacts of pilot TSP implementation. • RTC TSMO Demonstration Project • Purpose: Measure impacts of improvements on two key arterials • Southwest Region Advanced Traveler Information System Data Evaluation • Purpose: Determine usability and relative accuracy of INRIX™ traffic data for WSDOT traveler information applications. ITE Traffic Simulation RoundtableOctober 4, 2012

  3. TSP Pilot Project Overview • Mill Plain Blvd between Fort Vancouver Way and 160th Avenue • 22 intersections equipped, 8 included in analysis ITE Traffic Simulation RoundtableOctober 4, 2012

  4. TSP Pilot Evaluation Approach • Impacts assessed for both signal ops and transit • 3 Evaluation Phases • Data collected for AM, mid-day and PM peaks • CAD/AVL • APC • Intersection observation • Controller logs ITE Traffic Simulation RoundtableOctober 4, 2012

  5. Transportation Systems Management and Operations (TSMO) Demonstration Project Overview • Vancouver RTC TSMO Plan adopted 2011 • Andresen Road and Mill Plain Boulevard • New fiber • Signal upgrades • Intersection improvements • New CCTV and vehicle detection • Desired outcomes • Enhanced signal system performance • Improved response to real-time traffic conditions. • Expanded arterial traveler information • Automated data collection for planning and reporting ITE Traffic Simulation RoundtableOctober 4, 2012

  6. TSMO Corridor Evaluation Approach • Before/After evaluation of TSMO improvements • Corridor performance: segment travel times and vehicle speed • Signal timing: percent vehicle arrival during traffic signal green • Ongoing performance verification: vehicle volume, speed, and classification • Travel times • O-D • Volume • Speed • Classification • Percent vehicle arrival while green ITE Traffic Simulation RoundtableOctober 4, 2012

  7. WSDOT ATIS Data Evaluation Overview • Exploring viability of third-party data for powering WSDOT traveler information systems WSDOT INRIX Data Purchases • Statewide • One year of historical data • Access to INRIX Analytics • Accessible by all public agencies in WA • Southwest Region + Routes into Portland • One year of real-time data ITE Traffic Simulation RoundtableOctober 4, 2012

  8. WSDOT ATIS Evaluation Approach • Data Collection • INRIX Speed and Travel Time • WSDOT Loop Data (PORTAL) • Probe vehicles • Data Processing • Mapping corridor to TMC segments • Data Analysis • Calculate average travel time and speed for corridor (1 min intervals) • Calculate MOEs by corridor and speed bin • 0-30 bin is key ITE Traffic Simulation RoundtableOctober 4, 2012

  9. Next Steps Project Status • TSP Pilot: “Before” data collected, RFP for installation of signal equipt. to be awarded Nov. 13 • TSMO Corridor Demonstration: Bluetooth vendor & installation contractor in procurement • WSDOT ATIS: Preparing for probe vehicle data collection Continue to Explore Potential Cross-Project Coordination • Use of TSMO data to perform evaluation of INRIX arterial data • Installation of Bluetooth for additional freeway evaluations ITE Traffic Simulation RoundtableOctober 4, 2012

  10. Jill MacKay 206.521.9091 jmackay@ibigroup.com Thank you! ITE Traffic Simulation RoundtableOctober 4, 2012