An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Public Works Department Wisler Pierre-Louis, P.E., LEED AP BD+C, CFM, PMP Public Works Director

  2. Mission Statement Enhance the quality of life, health and safety of all residents by rendering proper and efficient sanitation, street, water, sewer, stormwater, fleet management, facilities maintenance and right-of-way maintenance services.

  3. Organization • North Miami • 10 sq. mi., NE Miami-Dade • 60,000 residents • Service Area • 90,000 residents • 22,000 connections • Staffing • 500 employees city-wide • 150 employees in PWD

  4. City Limits and Service Area

  5. City Limits and Service Area

  6. Winson Water Treatment Plant

  7. Winson WTP Upgrades • Well Rehabilitation • Filter Rehabilitation • WTP Improvements • Accelator • Sludge Basin • Clearwell • New Administration Building • Transfer and High Service Pumps • New Storage Tanks

  8. Winson WTP Upgrades • Well Rehabilitation

  9. Awards

  10. Awards • FSAWWA Region VII – Best Tasting Drinking Water • 2014 – 1st Place • 2013 – 1st Place • 2009 – 1st Place • FSAWWA State Drop Savers Poster Contest • 2014, Division 5 – 3rd Place

  11. Miami-Dade County Consent Decree • Sewer Overflow Response Plan • Information Management System Program • Sewer System Asset Management Plan • Gravity Sewer System O&M Program • Pump Station Operations & Preventative Maintenance Program • Force Main Operations & Preventative Maintenance and Assessment/Rehabilitation Program

  12. Recently Completed Projects • Biscayne Blvd. Force Main Project • NE 131st ST Force Main Project • NW 2nd AVE Force Main Project

  13. Biscayne Blvd. Force Main Project • 7,000 LF of 12-inch DIP • Contractor: JVA Engineering Contractor, Inc. • Engineer: EAC Consulting, Inc. • Cost: $1,586,000 • Start: 8/2014 • End: 3/2015

  14. Biscayne Blvd. Force Main Project

  15. NE 131 ST Force Main Project • 3,100 LF of 16-inch DIP • Contractor: Roadway Construction, LLC. • Engineer: Kimley-Horn and Associates • Cost: $694,000 • Start: 9/2014 • End: 6/2015

  16. NE 131 ST Force Main Project

  17. NW 2 AVE Force Main Project • 1,600 LF of 10-inch DIP • Contractor: Roadway Construction, LLC. • Engineer: Kimley-Horn and Associates • Cost: $375,000 • Start: 10/2014 • End: 6/2015

  18. NW 2 AVE Force Main Project

  19. Projects in Design • NE 6 AVE Water Main • NE 16 AVE Water Main • Hospital Pump Station • San Souci 1 Pump Station • San Souci 3 Pump Station

  20. Upcoming Projects • Sanitary Sewer Lining and Rehabilitation

  21. THANK YOU!