NOvA in the DOE Project Process by Ed Temple

NOvA in the DOE Project Process by Ed Temple. NOνA Collaboration Meeting May 5, 2005. Outline. Project Phases Project Acquisition Process and Critical Decisions DOE Order 413.3; Manual & Guide Conceptual Design Possible NOvA Schedule Preliminary Director’s Review of NOvA Next Steps.

susanna
Télécharger la présentation

NOvA in the DOE Project Process by Ed Temple

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NOvA in the DOE Project ProcessbyEd Temple NOνA Collaboration Meeting May 5, 2005

  2. Outline • Project Phases • Project Acquisition Process and Critical Decisions • DOE Order 413.3; Manual & Guide • Conceptual Design • Possible NOvA Schedule • Preliminary Director’s Review of NOvA • Next Steps

  3. Project Design Phases with DOE “Critical Decision” Overlay

  4. Project Acquisition Process and Critical Decisions

  5. Conceptual DesignDOE M 413.3

  6. Conceptual DesignDOE M 413.3

  7. Critical Decisions (CD)

  8. DOE Reviews

  9. Fermilab Director’s Reviews

  10. All CDs and Reviews

  11. NOvA Preliminary Director’s Review

  12. NOvA Preliminary Director’s Review (Continued)

  13. Next Steps • Staffing Project Office • Project Director (/Manager) • Schedule Person & Budget Person • Begin NOvA Project Management Working Group Meetings (Meet ~ Every Two Weeks) • Conceptual Design Report • WBS and Dictionary • CD-0 – Prepared by OHEP • Preliminary Director’s Review of NOvA • CD-1 • CDR • Cost Range • Schedule Range

  14. Next Steps (2) • CD-1 Director’s Review • CD-1 Lehman Review • CD-2 • TDR (Technical Design Report equivalent to Preliminary Design) • Resource Loaded Schedule with contingency • Cost – Detailed Basis of Estimate • Many Formal Documents